Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: UDC Manufacturer Industry Standard Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure Vacuum Hydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Test <br /> UDC#1/2 UDC#3/4 UDC#5/6 UDC#7/8 <br /> UDC Manufacturer: Bravo Bravo Bravo Bravo <br /> UDC Material: steel steel steel steel <br /> UDC Depth: 10.001, 10.001, 10.001, 10.001, <br /> Height from UDC Bottom to Top 0.00" 0.00" 0.00" 0.00" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 0.00" 0.00" 0.00" 0.00" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to clean clean clean clean <br /> testing: <br /> Portion of UDC Tested' 7.00" 7.00" 7.00" 7.00" <br /> Does turbine shut down when Yes ❑No RJ NA <br /> UDC sensor detects liquid(both Yes No Z NA Yes No NA Yes No NA <br /> product and water)?* <br /> Turbine shutdown response time n/a n/a n/a n/a <br /> Is system programmed for fail- Yes ❑No w NA Yes ❑No 17 NA Yes ❑No NA Yes No NA <br /> safe shutdown? <br /> Was fail-safe verified to be 7 Yes ❑No 0 NA ❑Yes ❑No a NA Yes ❑No E6 NA a Yes No NA <br /> operational?' <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: <br /> Initial Reading Rj): <br /> Test End Time: <br /> Final Reading(RF): Please See inion results <br /> Test Duration: <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: o Pass ❑Fail Pass Fail Pass ❑Fail Pass L Fail <br /> Was sensor removed for testing? Yes I No ❑NA Yes No NA v Yes -]No NA Yes ❑No NA <br /> Was sensor properly replaced and [7Yes ❑No ❑NA Yes :]No ❑NA , Yes ❑No ❑NA ❑Yes ❑No 'I NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-upfor failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to zLny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />