Laserfiche WebLink
SWRCB,Iamtary.2002 <br /> Page _of <br /> SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping CrMamtfacturstty Standard <br /> _. ❑Professional Eneineer <br /> 0 Other(Specify) <br /> Test:Method Used: ensure 0 Vacuum F-1 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: <br /> Equipmem Resohrtion: <br /> t Piping Rua# Piping Run# v Piping Run # Piping Run#„ <br /> Piping Material: <br /> Piping Maindwimer. C4 Gt <br /> Piping Dkmftw. <br /> Langth ofpiping Ram: <br /> Product Stored: <br /> Method and location of Ci�Lt �O� r, /✓ <br /> Wait time between applying <br /> Prmsorelvaantm/water and s /f/� ! j C� /01; 4 <br /> test: <br /> Test Start Time: <br /> Inidw Reading W: f.L /�.S G G f <br /> Test End Time: /C/ .✓zly <br /> Final Reading(RP): S f QST L Cf <br /> Test Duration: <br /> CliaOSe in Rading <br /> PasatPaTMeshold Or Ale e �d ,/O r�r� >L/© <br /> Criteria:a: �` i*' f� <br /> COmments—(include n4bnaaftan on repairs made prior to testing and recommended flow-up forfailed tests) <br /> Y I <br /> Y. <br />