Laserfiche WebLink
SWRCB, January 2002 page of <br /> S. PIPING S[JMP TESTING — — <br /> Test Method Developed By: 0 Sump.l5sawfichtrer a-Ib ustty'Standard C Professional Engineer <br /> = 0 other(SPec6) I <br /> Test,[6ethod Used'. 0 Pressure 0 vacuum E�rostauc <br /> Other Aw-djy) <br /> Tes Equipment used: Equipment Resolution: <br /> Swap# i "T rC Sump# y,L�;r.S Sump# /moi Sump# <br /> Sump Diameter: <br /> &imp DVk- <br /> Sump Material: <br /> Bdgbt from Tank Top to Top of 6 3 <br /> Penetration: <br /> Height from Tank Top to Lowest <br /> ElectricalPmeuvtion: <br /> Condition of sump prior to testing <br /> Portion of Sump Tested' S <br /> Does turbine shut down when <br /> so and <br /> ` qmd(both 0 Yea O No e lqfA ❑Yes ONo O Yes ONO [�A 0 Yes 0 No 0 NA <br /> a <br /> ductsensor= <br /> Turbine sbouim n response time <br /> Is syrstem god for fab-sa6e <br /> almtdown?' 11 Yes O No91IA OYes ONo Cr� ❑Yes ONo <br /> -R1�iOYtD <br /> es ONo NA <br /> Was faits verified to be <br /> operational?' 0 Yes 0 No 916A 0 Yes 0 N O Yes ONo 2lA O Yes ONo DNA <br /> Wait time between applying <br /> prcww vawtm(water and starting /lJ/i t '� /dY� "/ /<a,y<✓j <br /> testa: <br /> Test StartTime: <br /> Initial Reading(Rt): <br /> Test End Time: ' <br /> Firm Reading(RF): <br /> Test Duration: L� r`t r1�1 O iM <br /> Change in Reading(RFR4): "B �. <br /> PaswFail Threshold a Criteria:- 7 h-V <br /> 11 . _. <br /> Was sensor removed fortestW es 0 N 0NA __I�es ONo [INA es ONo ONA CYes ONo DNA <br /> Was smforpro al after testin ? <br /> and <br /> verified functional D'Yes 0 N 0 N l3Yes ONo DNA I &Ves ONo DNA OYes ONo CNA <br /> Comments—rinchae information on made pur to tem awd r�d aAaw Wed tests) <br /> B qt L <br /> i <br /> If the entire depth of the sump is not tested, specify now Hatch was tested. If the answer to air of the questions indicated with an <br /> astexisi2(*)is"NO" or"NA", the entire suaip:must be tested (See SWRCB LG-160) <br />