Laserfiche WebLink
4 — . = FR I 1 1 c P10p RE PE TR' OL 91W <br /> 9 S <br /> _. <br /> ERODE 7 STATUS REPORT <br /> November 4, 1988 <br /> Delta protect Number. 40-88-480 Client Federated Insurance Company <br /> 5260 Birdcage Street, Suite 200 <br /> 't Name Moore Petroleum P.O. Box 586 <br /> Yosemite Avenue Station Citrus Heights, CA 95611 <br /> 1399 East Yosemite Avenue Attn: Susan Sparks <br /> EL4I4&S�c^P-SL4I1: <br /> Mantica, CA <br /> Delta Proje.t Manaae_r. Darrell L. Nations Client Prqlect Number, 83Z-161 <br /> $ytinnlary of Work Performed Durtne October 198$: <br /> Initiated development of Work Plan for Preliminary Hydrogeclogic Assessment. <br /> Unusual Problems Encountered D rine Report Period and Solutions,• <br /> None, <br /> Plans for Additional Work DLrine November 1988: <br /> Completion and submitW of Work Plan to San Joaquin Local Health District. <br /> Prepared by: rG� C C� _ <br /> arrel� —I Nations <br /> Senior Hydrogeologist/Project Manager <br /> 'The purpose of this report is to present a brief summary of the status of this project. Ads' �i�uai <br /> detailed reports will be submitted as required throughout the project. <br /> Copies To: Jerry Moore <br /> Chris Metzger <br /> Tod D. Christenson <br /> DEC-005 DELTA ENYTRONMENIAL CONSULTANTS, INC. <br />