My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
14800
>
2300 - Underground Storage Tank Program
>
PR0231600
>
COMPLIANCE INFO_1986-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:11 PM
Creation date
11/8/2018 9:48:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2008
RECORD_ID
PR0231600
PE
2361
FACILITY_ID
FA0000957
FACILITY_NAME
LATHROP GAS & FOOD MART*
STREET_NUMBER
14800
Direction
S
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19702004
CURRENT_STATUS
02
SITE_LOCATION
14800 S HWY 99 RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\14800\PR0231600\COMPLIANCE INFO 1986-2008.PDF
QuestysFileName
COMPLIANCE INFO 1986-2008
QuestysRecordDate
8/30/2017 6:29:37 PM
QuestysRecordID
3613342
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 _ ID9 pP = 1 � 1 �� M ❑ VRE PETROL- F7 <br /> P or.. <br /> PROJECT STATUS REPORT' <br /> May 26, 1989 <br /> Deltaprolget Number: 40-88-479IC ient: Federated Insurance Company <br /> 5260 Birdcage Street, Suite 200 <br /> Moore Petroleum Frontage Road Station P.O. Box 586 <br /> 14800 Frontage Road Citrus Heights, CA 95611 <br /> Manteca, CA <br /> Attn: Susan Bourland <br /> Protect Location: 14800 Frontage Road <br /> Manteca, CA <br /> Dglta Pru eager: Darrell L, Nations Client Prolect Number: 83Z-159 <br /> Summary of Work Performed During April and May. 1982: <br /> Installed and developed two monitoring wells and sampled four monitoring wells (ail on-site wells) as <br /> part of the Phase I hydrogeologic assessment. Well elevations were surveyed and water levels <br /> i <br /> determined. Work commenced on development of the Phase I Xydrogeologic Assessment report. <br /> Unusual Problems Encountergd Du t2 or rio_ @nom tf <br /> None. <br /> Plans for Additional Work Dgring June 1989: <br /> Submission of Phase I Hydrogeologic Assessment report to the Central Valley Regional Water Quality <br /> Control Board and the San Joaquin Local Health District. <br /> Prepared by: A4�.4Cf <br /> Darrell L. Nations <br /> Senior Hydrogeologist/Project Manager <br /> 'The purpose of this report Is to present a brief summary of the status of this project. Addi I <br /> detailed reports will be submitted as required throughout the project. <br /> Copies To: Jerry Moore <br /> DEC-005 DELTA ENVIRONMENTAL CONSULTANTS, INC, <br />
The URL can be used to link to this page
Your browser does not support the video tag.