Laserfiche WebLink
4 _ 0 .9FR I 1 1 9 MOORE PETROL-F�t'1 <br /> P N 7 <br /> r . <br /> PRQJECT STATUS REPORT* <br /> May 26,1989 <br /> Delta Prolect Number. 40-88-480 cumt. Federated Insurance Compa.ty <br /> 5260 3irdeage Street, Suite 200 <br /> P fig: Moore Petroleum P.O. Box 586 <br /> Yosemite Avenue Station Citrus Heights, CA 95611 <br /> Attn: Susan Bourland <br /> Protect Loc0on: 1399 East Yosemite Avenue <br /> Mantica, CA <br /> Delta o &Yet: Darrell L. Nations Client Prolect Number: 83Z-161 <br /> Summary of-Work Performed Duytg April and May, 1989[ <br /> Installed and developed two ground water monitoring wells and sampled three monitoring wells as part <br /> of the Phase I hydrogeologic assessment. Well elevations were surveyed and water levels determined. <br /> Work commenced on development of the Phase 1 Hydrogeologic Assessment report. <br /> Unusual Problems Encountered During Rcvort Perlod and Solutions: <br /> None, <br /> Plani for Additional Work During June, 1989: <br /> Submission of the Phase 1 Hydrogeologic Assessment report to the ntral Valley Region. er Qulaity <br /> Control Board and the San Joaquin Local Health District. <br /> Prepared by: Q^.y`-t <br /> Darrell L. Nations <br /> Senior Hydrogeologist/Project Manager <br /> 'The purpose of this report Is to present a brief summary of the status of thls project. Addi, <br /> detailed reports will be submitted as required throughout the project. <br /> Copies To: Jerry Moore <br /> DELTA ENVIRONMENTAL CONSULTANTS, INC. <br />