My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
24323
>
2300 - Underground Storage Tank Program
>
PR0231947
>
COMPLIANCE INFO_2006 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2010
RECORD_ID
PR0231947
PE
2361
FACILITY_ID
FA0004345
FACILITY_NAME
JAHANT FOOD N FUEL STOP
STREET_NUMBER
24323
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00516019
CURRENT_STATUS
01
SITE_LOCATION
24323 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\24323\PR0231947\COMPLIANCE INFO 2006 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2010
QuestysRecordDate
2/10/2017 12:43:22 AM
QuestysRecordID
3335338
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ohF�lH. c <br />a•'�E't'••p SAN JOAQUIN COUNTY it <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />P. Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sioov.orc/ehd <br />�IFO'R� <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name:�I{-- <br />}�- \ <br />Leak detector <br />El❑ <br />In ('fcti Date: <br />❑ <br />❑ electronic Serial #: <br />IV <br />❑ line test programmed <br />❑ Caldwell System <br />Facility Address: <br />+323 <br />9 kky <br />V <br />Service Request #: <br />S neol <br />Onsite Service Technician' N <br />e:ICC <br />S rvice T hnician/Installer Exp. Date: <br />Manufacturer Training: <br />kul <br />_ <br />❑ mechanical Model: <br />$01 <br />�,wlcT <br />❑ <br />SERVICE <br />SERVICE <br />Leak detector <br />El❑ <br />_ <br />mechanical Model: <br />❑ <br />❑ electronic Serial #: <br />❑ Incon TS -STS <br />❑ line test programmed <br />❑ Caldwell System <br />Leak detector <br />El❑ <br />mechanical Model: <br />❑ minimum 5 gallon <br />❑ electronic Serial #: <br />❑ 1 hour hydrostatic <br />❑ line test programmed <br />Leak detector <br />❑ <br />_ <br />❑ mechanical Model: <br />Spill bucket <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />❑ Incon TS -STS <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fall safe Serial #: <br />a� <br />❑ NA <br />psi <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fall safe Serial #: <br />Sec dry containment testi ,9g fp <br />❑ NA <br />_ UDC(s) <br />sensor <br />❑ <br />_ <br />❑ positive shutdown Model: <br />UST(s) <br />❑ fail safe Serial #: <br />Testing for the above components are next due by: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />installation, 6 months after, and every 36 months thereafter. <br />Drop tube with mechanical overfill at 95% <br />V[:Ove;rfill <br />prevention (see LG letter 150-1) <br />aw-RWINNINERY MOM, Wo <br />SERVICE <br />R."03W <br />Spill bucket <br />❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic <br />❑ Incon TS -STS <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY <br />❑ Caldwell System <br />❑ Other <br />Spill bucket <br />❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic <br />❑ Incon TS -STS <br />❑ Caldwell System <br />❑ Other <br />Spill bucket <br />❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic <br />❑ Incon TS -STS <br />❑ Caldwell System <br />❑ Other <br />rary piping testing at: <br />!0P,! <br />a� <br />psi <br />50 minutes <br />Sec dry containment testi ,9g fp <br />_ UDC(s) <br />t6�G1 Piping <br />Sump(s) <br />UST(s) <br />Testing for the above components are next due by: <br />Note. Please be aware that P wntainment components are required to" tested uwn <br />installation, 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />aw-RWINNINERY MOM, Wo <br />i ,Lu 'I1"i .. �"I'MEtV <br />R."03W <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY <br />e .o �,�_� <br />EHD 23-04 <br />Rev 11/17//08 <br />UST SERVICE REQUEST INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.