Laserfiche WebLink
S WRCB, January 2002 • • Page 1 of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: iping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> er(Spec6) <br /> Test Method Ind: pressure 0 Vacuum 0 Hydrostatic <br /> //❑Other(Specify) <br /> Test Equipment Used: O 5rc;;,p �R ;*S} ij L,V,n 4 r.kI Equipment Resolution: 1 O— 1 y>�k <br /> S <br /> Piping Run#L Piping Run# 2— Piping Run# 3 Piping Run# <br /> Piping Material: /uzS 16va55 _j rkc /Gz3 i ry /�S5 <br /> Piping Manufacturer: A I.rlh Mac oewl <br /> Piping Diameter: t - i ir i 2' Z I i tt <br /> Length of Piping Run: 14 rt>C. 1'�-U 1 {} yJ u.. I! )r P io< , l?b' I v Y. <br /> Product Stored: v-, <br /> Method and location ofe <br /> i apo,p , Tl s tea Su lyv (� F 4 S P L <br /> i in -run isolation: pf me s, &-L [•'1"-t "� '�S 1 'v�-TK -'sal- T✓r. <br /> a between applying t Ir <br /> ressure/ cuum/water and <br /> s ing test: 4-- <br /> Test <br /> Test Start Time: <br /> Initial Reading(RO: 5 /�5 S f�S t7 <br /> S� s r s/;Is7- <br /> Test End Time: i L y U Z- YU <br /> Final Reading(RF): T 5'Af r <br /> Test Duration: be,u Grouv Uvv ( Gt <br /> Change in Reading(RF-R,): Z- <br /> Pass/Fail Threshold or <br /> Criteria: )v0 CufS .v i++rS C /Us VSs too yJ(-I /UJ(LSS fx I tS*7 jt)e Six i�S_i <br /> Test Result: 'W-'Pass D FailPass0 Fail , Pass D Fail D Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow up or failed tests) <br />