My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
24323
>
2300 - Underground Storage Tank Program
>
PR0231947
>
COMPLIANCE INFO_2006 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2010
RECORD_ID
PR0231947
PE
2361
FACILITY_ID
FA0004345
FACILITY_NAME
JAHANT FOOD N FUEL STOP
STREET_NUMBER
24323
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00516019
CURRENT_STATUS
01
SITE_LOCATION
24323 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\24323\PR0231947\COMPLIANCE INFO 2006 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2010
QuestysRecordDate
2/10/2017 12:43:22 AM
QuestysRecordID
3335338
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• / � <br /> SWRCB,January 2002 • P'age 1 'of r <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: D UDC Manufacturer 0 Industry Standard Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: D Pressure D VacuumJ8 FIydrostatic " <br /> 0 Other(Spec) <br /> Test Equipment Used: ( t j, Pl l .e vP L �,t cu T Q Sv�t c ct TY Equipment Resolution: , oda S� <br /> UDC# 4-/O UDC# l l I-l Z UDC# I r-1 UDC# ( f-11, <br /> UDC Manufacturer: uk4 IGvrr Uvtic�� L4 lc.huunn Lk"tcv t&v <br /> UDC Material: <br /> UDC Depth: G <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to r LA D 1 <br /> testing: ✓ v The <br /> Portion of UDC Tested wek-ier Lofj, It', ;es <br /> rr 1044, lit, a_Aj4_y Wit.. t eo UJkt e COtI— tIu <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both XYes D No D NA 17 No DNAes DNo DNA Yes DNo DNA <br /> roduct and water)?� <br /> Turbine shutdown response time No C we vAA► v C We k-a W.3k C W c" �a�IQ <br /> system programmed for fail- <br /> safe shutdown? f Yes ❑No ❑NA Pes ❑No ❑NA Yes ❑No ❑NA XYes ❑No ❑NA <br /> Was fail-safe verified to be <br /> operational?* D yes 18(No D NA D Yes>Ko DNA D Yes?EINo DNA D Yes/PWo DNA <br /> Wait time between applying <br /> pressure/vac u wate and <br /> starting test /o vK1hi.. S /D , is .k t7 cn.'rti,.al-r.� 'r <br /> Test Start Time: <br /> Initial Reading Ri): + r CAC. <br /> e_ i f i t c r } cif '•c_ <br /> Test End Time: — <br /> Final Reading(RF): ;v t c d LG Pv �t F:r i 4- c rGi <br /> Test Duration: _ 6 30 rk j-c 3D <br /> Chane in Reading(RF-Ri): No o , t c u ti c i ti f�i o Ghcw G <br /> Pass/Fail ThresholdorCriteria: a5fcs s hi. .4cs vos ,r,, li�eS <br /> Test Result: Pass ❑Fail kPass D Fail Pass 0 Fail Pass D Fail <br /> Was sensor removed for testing? es 0 No D NA YYes D No 0 NA es D No DNA es D No DNA <br /> Was sensor properly replaced and A( <br /> Yes functional after testing? yes 13 No ❑NA es L1 No ❑NA A(Yes 0 No DNA IVYes D No DNA <br /> Comments—(include information on repairs made prior to testing and recommended follow-up or failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(')is"NO"or"NA", the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.