Laserfiche WebLink
SWRCB,January 2002 • • Page r,' of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> .® Test Method Developed By: ❑Spill Bucket Manufacturer 0 Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic/ <br /> `e ❑Other(Specify) <br /> Test Equipment Used: •„ Equipment Resolgti : <br /> Spill Boz.,# Spill Box# ,Splif Box# Spill Box# <br /> Bucket Diameter: ` <br /> Bucket Depth: / <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: . <br /> Test Start Time: <br /> Initial Reading(111): <br /> Test End Time: .r <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(Rr-FI <br /> Pass/Fail Threshoor <br /> Criteria: <br /> Test Result: ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass ❑Fail <br /> Com ents— include information on repairs made prior to testing, and recommended ollow-u or ailed W—) <br /> $u.11 ulel ;113!nC�ST�3fc� . k.ta+w�LE pi lv �'(J +i ci4,a Slee. � cu ��rrt <br />