Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box H no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? t <br /> ❑ Yes ❑ No' Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No' Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No' Were all probes reinstalled property? APP, 2 4 2017 <br /> ❑ Yes ❑ No- Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In section H,below,describe how and when these deficiencies ware or will be corrected. ENVIRONMENTAL HEALTH <br /> Line Leak Detectors(LLD): ❑ Check this box H LLDs are not installed DEPARTMENT <br /> Com late the following checklist: <br /> ® Yes ❑ No' For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rate. ®3 g.p.h.; ❑0.1 g.p.h, ❑0.2 g.p.h. <br /> ❑ Yes ® NW Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No' Was the testing apparatus property calibrated? <br /> ® Yes ❑ No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off l any portion of the monitoring system is disabled or disconnected? <br /> ® N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ® N/A <br /> ❑ Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In Section H,below,describe how and when these deficiencies were or will he corrected. <br /> H. Comments: ADJUSTED ALL 3 LEAK DETECTORS <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />