Laserfiche WebLink
J <br /> F. In-Tank Gauging/SIR Equipment: N Check this box if tank gauging used only for inventory control. <br /> [ICheck this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> L'[1 Yes Has all input wring been inspected for proper entry and termination,including testing for gro d <br /> Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Was accuracy of system product level readings tested? <br /> Was accuracy of system water level readings tested? <br /> ' Were all probes reinstalled properly? MENIAL HEAL H <br /> ' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> COC\ 7.",J�Eh�T <br /> 'In Section H,below,describe how and when these dettclencies were or will be corrected. <br /> Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed <br /> FYeS (3 <br /> win checklist:' For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> Simulated leak rate: ®3 g.p.h.; ❑0.1 g.p.h ❑0.2 g.p.h. <br /> ' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ' Was the testing apparatus properly calibrated? <br /> ' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ® N/A <br /> [IYes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or tails a test? <br /> ® N/A <br /> ❑ Ves ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No- Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comment: ADJUSTED ALL 3 LEAK DETECTORS <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />