My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2008-2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/22/2008 12:01 9163712450 BZ MANITANENCE PAGE 03/10 <br /> • <br /> SWRCB,January 2002 <br /> Page, of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: 11 Tank Manufacturer X Industry Standard 0 Professional Engineer Other(Specify) <br /> Test Method Used: 0 Pressure X Vacuum C I-lydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: In"rig Gauges Equipment Resolution: <br /> dgjY I , � " ............. <br /> W;C A <br /> Tank#87 Tank#89 Tank 4 91 Tank# <br /> Js Tank Exempt From Testing?' 0 Yes X No 0 Yes XNo 0 Yes X No 0 Yes 0 No <br /> Tank capacity: 20,000 12P00 10,000 <br /> Tank Material: Fiberglass Fiberglass Fiberglass <br /> Tank Manufacturer: UK UK UK <br /> Product Stored: 87 89 91 <br /> Wait time between applying <br /> pressure/vacuum/water and 3 min 3 min 3 min <br /> starting test: <br /> Test Start Time; 10:00 am. 10,00 am. 10:00 am. <br /> Initial Reading(R,): -10"I-Ig -10-Hg --10-Hg <br /> Test End Time: 11:00 JLm- 11:00 am. 11:00 am. <br /> Final Reading(Rp); -10"Hg -10"H9 -to"Hg <br /> Test Duration: I Hour I Hour I Hour <br /> Change in Reading(Rr-R,)! 0 0 0 <br /> Pass/Fail Threshold(m-Criteria: 0 0 0 <br /> T <br /> 0 : • is• 01A <br /> Was sensor removed for testing? X Yes ONo 0 NA X Yes 0 No 0 NA X Yes D No Cl NA C Yes CI No CNA <br /> Was sensor properly replaced and X Yes ONo 0 NA X Yes 0 No 0 NA X Yes 0 No 0 NA n Yes 0 No C1 NA <br /> verified functional after testing? <br /> Comments—(include Y <br /> .2nnadon on repalry made prior Io lestiaR,and recommended follow-up forfaded rests) <br /> Secondary containment systems where the cmfinumm monitoring automatically monitors both the primary and'second1my <br /> containment,such w systems that are hydrostatically monitored or under CODStOnt VRCIJUM,we exempt from periodic containment <br /> testing. f California Code of Regulations,TitIc 23,Section 2637(aX6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.