My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2008-2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/22/2008 12:01 9163712450 BZ MANITANENCE PAGE 04/10 <br /> SWRCB,January 2002 Page—of— <br /> 5. SECONDARY PIPE, TESTING <br /> Test Method Developed By; 0 Piping Manufacturer X Indus"Standard 0 Professional.Engineer <br /> 0 Other(Specify.) <br /> To-%t.Method Used: X Pressure 0 Vacuum ❑Hydrosutic <br /> 0 Other(Specify) <br /> Test Equipment Used;Psi Gauges Equipment Resolution: <br /> " <br /> LIMmgog <br /> Piping Run#87 Piping Piping Run 9 91 Piping Run 0,I n,,I� Run 89 <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: AO Smith AO Smith AO Smith <br /> Piping Diameter: 3" 3" 379 <br /> Length of Piping Run: 43" 51" 51" <br /> Product Stored: 87 89 91 <br /> Method and location of Boot In Sump Bmt in Sump Root in Sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 3 min. 3 min. 3 min. <br /> starting test: <br /> Test SW Time: 10:30 am. 10:30 am. 10:30 am. <br /> Initial Reading(RT): 5 Psi 5 PO 5 Psi <br /> Test End Time: 11:00 a.m. 11:00 am. 11:00 am. <br /> Final Reading(Rr): 5 Psi 5 Psi 5 Psi <br /> Test Duration: 30 min. 30 min. 30 min. <br /> Change in Reading(RrR,): 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria; <br /> etatpta <br /> pip <br /> Comments—rinclude information an repairs madapHor to testing,and recammandedfollow-up forfaded tasrs) <br />
The URL can be used to link to this page
Your browser does not support the video tag.