My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2008-2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/22/2008 12:01 9163712450 SZ MANITANENCE PAGE 07/10 <br /> SWRCB,lana y 2002 Pago_of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDQ TESTING <br /> Test Method Developed ray: C UDC Manufacturer X Industry, Standard q Professional Engineer <br /> C Other(Sped) <br /> Test Method Used: C Pressure D Vacuum X Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used:Incon TS-STS Equipment Resolution: <br /> tl ^s " NINNIES! UDC# 9& 10 UDC UDC UDC 15& lfi <br /> UDC Manufacturer: UK UK UK UI{ <br /> UDC Material: Fiberglass Fiberglass Fibc ss Fiberglass <br /> UDC D the 33" 33" 33" 33" <br /> Height from UDC Bottom to Top 9„ 9„ 9" 9„ <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 51, 5„ 5" S" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testin : <br /> Portion of UVC Tested 2"Abovc Pi in 2"AbovePl in 2"Above Piping 2"Above PI in <br /> Does turbineshut down when <br /> tMC sensor detects liquid(both C Yes C No X NA C Yes 17 No X NA C Ycs CNo X NA 13 Yes C No X NA <br /> roduct and water)?" <br /> Turbine shutdown reTonse time <br /> Is system programmed for fail- C Yes C No X NA C Yes C No X NA ]YL- n No X NA C Yes CNo X NA <br /> safe shutdown?" <br /> Was fail-safe verified to be C Yes C No X NA C Yes C No X NA C Yes C No X NA C Yes f1No X NA <br /> operationaff <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min. 5 min. 5 min. 5 min. <br /> startin test <br /> Test Start Time: 2:28 p.m. 2:28 p.m. 2:05 p.m. 2:05m. <br /> Initial Reading CRI): 3.0500 1.9797 3.0500 3.0500 <br /> Test End Time: 2:43 .m. 2:43 m. 2:20P.M. 2:20 .m. <br /> Final Readin (RF): 3.0498 1.9797 3,0498 3.0495 <br /> Test Duration: 15 min. 15 mtm 15 min. 15 min. <br /> Chan go in Readin (RF-RD: .0001 0 .001 .001 <br /> Passirail Threshold or Criteria: .002 .002 .002 .002 <br /> )" st i(€te9nlj Xit <br /> Was sensor removed for testing? X Yes C No C NA X Yes CNo CNA X Yes CNo CNA X Yes CNo CNA <br /> Was sensor prnperly replaced and X Yes CNo CNA X Yes 0N CNA X Yes CNo CNA X Yes CNo CNA <br /> verified functional after testing? <br /> Comments—(include information on rgpatra made prior to zeatin ,and recommended ollow-vp jorfaGed rears) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire LIDCmust be tested. (See SWRC8 LCr 160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.