My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2008-2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/22/2008 12:01 9163712450 BZ MANITANENCE PAGE 06/10 <br /> SWRCB,January 7.102 Page—of— <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: 0 UDC Manufacturer X Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br /> 0 other(Specify) <br /> Test Equipment Used:Incon TS-STS Equipment Resolution: <br /> UDC# ( &2 UAC#3&4 UAC#5 &6 UDC 97&8 <br /> UDC Manufacturer: UK UK UK UK <br /> UDC Material: Fiber lass Fiberglass FibeMlass Fiberulass <br /> UDC 022th: 3311 33" 33" 33" <br /> Height from UDC Bottom to Top 9" 8" 1 9" 8 <br /> of Highest Piping Penetration: — <br /> Height from UDC Bottom to 5" 4" 61, <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested i 21'Above Piping 2"Above Piping 2"Above Pivina 2"Above!!!ping <br /> Docs turbine shut down when <br /> UDC sensor detects liquid(both CYes ONo XNA OYes 0 N XNA FJ Yee 0 N XNA 0 Yes 0 No X NA <br /> pioduct and water)? <br /> Turbine shutdown response time <br /> Is system programmed for fail- 0 Yes 0 No X NA 0 Yes 0 No X NA 0 Yes 0 No X NA 0 Yes 0 No X NA <br /> safe shutdown?* <br /> Was fail-sofa verified to be 0 Yes 0 N X NA 0 Yes rl No X NA 1-1 Yes 0 No X NA 0 Yet n No X NA <br /> operatJonaff <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test <br /> Test Start Time: 2;50 p.m 2.50 2:50 p.m. 1 2:28 p.m. <br /> Tnitial Reading(R,): 5.3690 4.0893 2-5497 4.1515 <br /> Test End Time: 3:05 P.M. 3:05 P.M. 3,05 p.m. 2:43 p.m. <br /> 5.3690 4.6895 2.5495 4.1513 <br /> 15 min. 11 min. 15 mins 15 min. <br /> Change in Reading(7ZF-Rn): 0 .01HP2 .0002 .0002 <br /> Poss/Foil Threshold or Criteria- .002 .002 .002 .002 <br /> ..Friss', .l :Fai4 . -t I.. : . <br /> p: b :3. As 1 ta F A E:. <br /> �—as sensortm� kw li <br /> Fbrtcqting? X Yes 0 No 0 NA X Yes 0 No Q NA XYes ONO DNA X Yes 0 N Cl NA <br /> Was sensor properly replaced and X Yes 0 No 0 NA X Yes 0 No DNA Xycs 0 N DNA X Yes 0 No 0 NA <br /> verified functional after te;ting7 <br /> Comments-rinclude information on repairs made prior to teging,and recommended fallow-upforfalled texts) <br /> 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with nn <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRC13 LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.