My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2008-2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SB Series Pellethane SplitRepair Boots Installation <br /> For Encapsulation Repairs) <br /> STEP I Identify the damaged boot and select the proper Blueline Repair ,. <br /> Boot based upon the number of studs and the pipe OD.(See 2006 <br /> Catalog,Section 10 and Appendix 1) <br /> STEP 2 Install all Pellethane split components onto the pipe carefully.All <br /> s <br /> Pellethane pieces must be rebonded back together with Blue Seal <br /> Glue.This is done by ensuring that the surfaces are clean and dry. <br /> Apply a liberal bead of Blue Seal and hold the seam closed - <br /> securely until it is fused. It's helpful to use the clamps to loosely <br /> hold the boot closed during curing. Bonded connections should f �� <br /> hold themselves closed within five minutes if there are no stresses <br /> on them.The Blue Seal glue will be fully cured in 40 minutes. <br /> STEP Once all Blueline approved components are bonded, apply a <br /> liberal bead of either Parasealant 626, or Bostik IIOOFS to the <br /> underside of the seal.This will make the seal with the sump wall. <br /> Insert poly ring into the gasket and position the ring around the <br /> old fitting and against the sump wall. <br /> STEP 4 Install the self tapping tek screws through the holes in the poly =---------- _ --- <br /> ring and tighten until snug. (Be careful not to over tighten as the <br /> holes can be easily stripped out.) r <br /> STEP 5 Apply a bead of Blue Seal Glue along the gasket rim and install <br /> the boot onto the seal. Install boot with fill tube at the 12,00 iA i <br /> position.Install band clamp to secure the boot to the <br /> gasket.position. 1 ... <br /> BLUELINE TECHNOLOGIES 2001 ■ Fax:[866]31&3848 <br />
The URL can be used to link to this page
Your browser does not support the video tag.