My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2008-2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SB Series Pellethane SplitRepair Boots Installation Instructions <br /> For Encapsulation Repairs) <br /> STEP 6 Position the insert into the boot if applicable, but do not tighten `---� <br /> the clamp.This connection must remain loose through the filling k <br /> stage to allow air to escape. -- - <br /> STEP 7 Fill the boot with either Parasealant 626, or Bostik 1100FS <br /> through the fill tube with the Blueline pneumatic dispensing gun j <br /> until the entire cavity is full. This will ensure that the sealant <br /> pushes back through the leak point and stops the leak. <br /> .r <br /> rw <br /> } <br /> STEP 8 Once the boot is full, tighten clamps and allow sealant to fully <br /> cure. The sealant will gradually continue to cure up inside the <br /> boot and around the flange over the next 2448 hours. However, <br /> you may start hydrostatic testing immediately as the repair is " <br /> complete. <br /> BLUELINE • • 2001 • 310-3848 <br />
The URL can be used to link to this page
Your browser does not support the video tag.