Laserfiche WebLink
S WRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: X Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution:0-15 PSI <br /> Piping Run# 1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron Ameron <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: 450' 450' 450' <br /> Product Stored: Premium Regular Super <br /> Method and location of <br /> piping-run isolation: Test boot Test boot Test boot Test boot <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 9:00 10:55 2:35 <br /> Initial Reading(Rj): 5 PSI 5 PSI 5 PSI <br /> Test End Time: 10:00 11:55 3:35 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI <br /> 'rest Duration: I Hour I Hour I Hour 1 Hour <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Result: x Pass 0 Fail a Pass 0 Fail x Pass ❑Fail 0 Pass 0 Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for foiled tests) <br /> Test boot on the super line was replaced at turbine sump. Clamps on regular and super line were tightened <br /> In the dispenser pans. <br />