Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer 0 Industry Standard X Professional Engineer <br /> D Other(Spec) <br /> Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br /> 0 Other(Spec() <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> Sump#I Sump#2 Sump#3 Sump# <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 49" 49" 50" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank'Fop to'Fop of 18" IT, 17" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 16" 26" 23" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' 2"above Highest piping penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both x Yes 0 No 0 NA x Yes 0 No DNA x Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> product and water <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe x Yes D No DNA x Yes 0 No DNA x Yes 0 No DNA 0 Yes 0 No D NA <br /> shutdown?` <br /> Was fail-safe verified to be 0 Yes x No 0 NA O Yes x No DNA 0 Yes x No D NA 0 Yes 0 No 0 NA <br /> o eradonal?o <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min 5 min <br /> test: <br /> Test Start Time: 9:25 10:35 3:35 <br /> Initial Reading(Ri): .00" .00" .00" .00" <br /> "Pest End Time: 9:55 11:05 4:05 <br /> Final Reading(RF): .00 .00 .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-Rt): .00 .00 .00 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> Test Result: z Pass D Fail s Pass 0 Fail a Pass 0 Fall D Pass D Fall <br /> Was sensor removed for testing? x Yes 0 No 0 NA x Yes 0 No DNA x Yes 0 No [INA 0 Yes r I No ❑NA <br /> Was sensor properly replaced and x Yes 0 No D NA x Yes D No DNA x Yes 0 No DNA I:I Yes Il No [INA <br /> verified functional after testin ? <br /> COMMenta—(include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(•)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />