My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2300 - Underground Storage Tank Program
>
PR0231210
>
COMPLIANCE INFO 2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:54:23 PM
Creation date
11/8/2018 9:50:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0231210
PE
2361
FACILITY_ID
FA0003747
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\NAVY\3515\PR0231210\COMPLIANCE INFO 2006-2015.PDF
QuestysFileName
COMPLIANCE INFO 2006-2015
QuestysRecordDate
8/4/2017 7:52:05 PM
QuestysRecordID
3555178
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r I RECEIVED <br /> DEC 112015 <br /> UST SYSTE RETROFIT OR REPAIR ENVIRONMENTAL <br /> (submit minimum of 3 sets of plan R applications as originals will beretained byRMTH f)FPARTMFNT <br /> I <br /> 1. Site map enclosed? YES NO <br /> 2. Submit copies of ICC Service Techniblan and/or nstaller's certificate and all manufacturer training.certificates foreech <br /> person installing or testing any component tha�i repaired or replaced. Ensure s copy of the°Site Health and Safety <br /> Plan"is available on the jobsite as required by i e B. <br /> 3. Detaileddescriptionof work to be completed. i t components to be repaired or replaced and attach..a,diagram drawn <br /> to scale showing location of repairs and/or caplet mens, If repairing a component,describe how this:will be done. (if <br /> addino piping, UDC's, or other UST equipment;, r performing.tanktop upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan reviavi): <br /> t <br /> ove and Replace old penetration fitting in Vap lank for bulk fueling rack.it will be a like for like replacementin Icon fittings. TNrS tm JS i'ffg v5T Sb <br /> ��Wdn 5�t� /a-(}AUkk� t�TVN� of �djt Ti,�6 ¢irtW6 � GEfif� p�� <br /> Wf 14jllL /� Lax i s P�6 JG- G nGd �Nc SuLA�o� s r f r <br /> f���o R- �iry l7Tf�✓� W I"r1-I � � �J.nIOL , ly�� Fa^- L/JL <br /> U i4f ' <br /> i <br /> i <br /> 4. List of equipment to be used(Attach manufacturer specifibatignsheels showing third-party approval): <br /> ICON <br /> i <br /> 2 <br /> it <br />
The URL can be used to link to this page
Your browser does not support the video tag.