My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2300 - Underground Storage Tank Program
>
PR0231210
>
COMPLIANCE INFO 2006-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 1:54:23 PM
Creation date
11/8/2018 9:50:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2015
RECORD_ID
PR0231210
PE
2361
FACILITY_ID
FA0003747
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
Dr
City
Stockton
Zip
95203
APN
161-030-02
CURRENT_STATUS
01
SITE_LOCATION
3515 Navy Dr
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\NAVY\3515\PR0231210\COMPLIANCE INFO 2006-2015.PDF
QuestysFileName
COMPLIANCE INFO 2006-2015
QuestysRecordDate
8/4/2017 7:52:05 PM
QuestysRecordID
3555178
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC 11 2015 <br /> ENVIRONMENTAL <br /> UST SYSTEM RETROFIT OR REPAIR WICAITU nc:Dd DTAA^AiT <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> t. Site map enclosed? YES NO ✓(] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done, (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Remove and Replace old penetration fitting in Vapor tank for bulk fueling rack. It will be a like for like replacement <br /> utilizing icon fittings. -THIS b.l 106 UST :5�- <br /> 6116}1T er�TUNf of ��PStr�6 ¢17tt✓d LdAK�pr <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> ICON <br /> i <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.