My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:44:43 PM
Creation date
11/8/2018 9:52:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
12/6/2016 12:58:59 AM
QuestysRecordID
3271591
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Equipment: <br />®Check this box if tank gauging is used only for inventory control. <br />❑Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Com lete the 11owinc, checklist: <br />® Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />® Yes <br />❑ <br />No* <br />were all tank -gauging probes visually inspected for damage and residue buildup? <br />® Yes <br />❑ <br />No* <br />was accuracy of system product level readings tested? <br />® Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />® Yes <br />❑ <br />No* <br />were all probes reinstalled properly? <br />® Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ® Check this box if LLDs are not installed. <br />Co Tete the followin checklist: <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />NO LLD'S ON THE DSL. <br />Page 3 of 3 <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ Yes <br />❑N/A <br />(Check all that a 1 Simulated leak rate: ❑ 3 ..h. ❑ 0.1 . .h ; ❑ 0.2 ..h. <br />El <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No* <br />❑ N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ Yes <br />❑ No* <br />❑ N/A <br />For electronic LI.Ds, does the turbine automatically shut off if the LLD detects a leak? <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ Yes <br />❑ N/A <br />or disconnected? <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />❑ Yes <br />❑ N/A <br />malfunctions or fails a test? <br />❑ Yes <br />❑ No* <br />❑ N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ Yes <br />❑No* <br />i Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />NO LLD'S ON THE DSL. <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.