My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:44:43 PM
Creation date
11/8/2018 9:52:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
12/6/2016 12:58:59 AM
QuestysRecordID
3271591
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />6. Piping Sump Testing <br />Page 4 of 5 <br />Test Method Developed By. <br />O Piping Manufacturer OO Industry Standard O Professional Engineer <br />O Other (Specify) <br />Test Method Used. <br />O Pressure O Vacuum .O Hydrostatic <br />O Other (Specify) <br />Test Equipment Used: INCON jEcuipment Resolution: +/_ 0.002 Inches <br />Sump# TCY1 Sump# TCY7 Sump# TCY2 Sump# <br />Sump Diameter: <br />42" <br />42" <br />Sump Depth <br />51" <br />42" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />eight from Tank Top to Top of <br />Highest Piping Penetration: <br />30" <br />20 <br />Height from Tank Top to Lowest <br />lectrical Penetration: <br />31" <br />10 <br />ondition of sump prior to testing: <br />Clean and dry <br />Clean and dry <br />ortion of Sump Tested' <br />2" Above Highest <br />2" Above Highest <br />Does turbine shut down when <br />ump sensor detects liquid <br />both product and water)?' <br />❑ Yes ❑ ND NM <br />❑ Yrs ❑ No N NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ ND ❑ NA <br />Turbine shutdown response time. <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />hutdown?' <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />as fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ ND ❑ NA <br />Wad time between applying <br />pressure/vacuum/water and <br />farting test. <br />10 min. <br />10 min. <br />Test Start Time: <br />15:21 /15:51 <br />18:04 /18:20 <br />Initial Reading (R,) <br />3.6442 / 3.6222 <br />2.3479 / 2.3480 <br />est End Time: <br />15:36 /16:06 <br />18:20 /18:35 <br />nal Reading (R,) <br />3.6395 / 3.6187 <br />2.3480 / 2.3482 <br />est Duration: <br />15 min. / 15 min. <br />15 min. 115 min. <br />hange in Reading (R, -R,) <br />0.0047 / 0.0035 <br />-0.0001 1-0.0002 <br />NOT TESTED <br />ass/Fail Threshold or Criteria: <br />+1-0.002" <br />+1-0.002" <br />est Result: <br />N Pass ❑ Fail <br />N Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />N Yes ❑ No ❑ NA <br />N Yes ❑ No ❑ NA <br />❑ Yes ❑ No N NA <br />❑ Yrs ❑ No ❑ NA <br />as sensor properly replaced and erified functional after testing? <br />N Yes ❑ No ❑ NA <br />N Yes ❑ No ❑ NA <br />❑ Yes ❑ No NM <br />❑ Yes ❑ ND ❑ NA <br />Comments - (include information on repairs made prior to testing, and recommended follow-up failed tests) <br />TIC.112..waste-od.was..not.tested-d.ue..to..damaged.to.sk..k o.o.tat.iecandary...Product ..... <br />Needs to be repaired so the sump and secondary line can be tested.. <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (•) is'NO" or "NA', the entire sump must be tested. (See SWRCB LD -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.