Laserfiche WebLink
SWRCB, January 2002 <br />6. Piping Sump Testing <br />Page 4 of 5 <br />Test Method Developed By. <br />O Piping Manufacturer OO Industry Standard O Professional Engineer <br />O Other (Specify) <br />Test Method Used. <br />O Pressure O Vacuum .O Hydrostatic <br />O Other (Specify) <br />Test Equipment Used: INCON jEcuipment Resolution: +/_ 0.002 Inches <br />Sump# TCY1 Sump# TCY7 Sump# TCY2 Sump# <br />Sump Diameter: <br />42" <br />42" <br />Sump Depth <br />51" <br />42" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />eight from Tank Top to Top of <br />Highest Piping Penetration: <br />30" <br />20 <br />Height from Tank Top to Lowest <br />lectrical Penetration: <br />31" <br />10 <br />ondition of sump prior to testing: <br />Clean and dry <br />Clean and dry <br />ortion of Sump Tested' <br />2" Above Highest <br />2" Above Highest <br />Does turbine shut down when <br />ump sensor detects liquid <br />both product and water)?' <br />❑ Yes ❑ ND NM <br />❑ Yrs ❑ No N NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ ND ❑ NA <br />Turbine shutdown response time. <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />hutdown?' <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />as fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No N NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ ND ❑ NA <br />Wad time between applying <br />pressure/vacuum/water and <br />farting test. <br />10 min. <br />10 min. <br />Test Start Time: <br />15:21 /15:51 <br />18:04 /18:20 <br />Initial Reading (R,) <br />3.6442 / 3.6222 <br />2.3479 / 2.3480 <br />est End Time: <br />15:36 /16:06 <br />18:20 /18:35 <br />nal Reading (R,) <br />3.6395 / 3.6187 <br />2.3480 / 2.3482 <br />est Duration: <br />15 min. / 15 min. <br />15 min. 115 min. <br />hange in Reading (R, -R,) <br />0.0047 / 0.0035 <br />-0.0001 1-0.0002 <br />NOT TESTED <br />ass/Fail Threshold or Criteria: <br />+1-0.002" <br />+1-0.002" <br />est Result: <br />N Pass ❑ Fail <br />N Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />N Yes ❑ No ❑ NA <br />N Yes ❑ No ❑ NA <br />❑ Yes ❑ No N NA <br />❑ Yrs ❑ No ❑ NA <br />as sensor properly replaced and erified functional after testing? <br />N Yes ❑ No ❑ NA <br />N Yes ❑ No ❑ NA <br />❑ Yes ❑ No NM <br />❑ Yes ❑ ND ❑ NA <br />Comments - (include information on repairs made prior to testing, and recommended follow-up failed tests) <br />TIC.112..waste-od.was..not.tested-d.ue..to..damaged.to.sk..k o.o.tat.iecandary...Product ..... <br />Needs to be repaired so the sump and secondary line can be tested.. <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (•) is'NO" or "NA', the entire sump must be tested. (See SWRCB LD -160) <br />