My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:44:43 PM
Creation date
11/8/2018 9:52:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
12/6/2016 12:58:59 AM
QuestysRecordID
3271591
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page 3 of 5 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By. <br />O Piping Manufacturer OO Industry Standard O Professional Engineer <br />O Other (Specify) <br />Test Method Used. <br />OO Pressure O Vacuum O Hydrostatic <br />O Other (Specify) <br />Test Equipment Used: 4-1/2 PRESSURE GAUGE JEquipment Resolution: +/_ 0.25% Accuracy <br />Piping Run # 1-P PipingRun# 7-V Piping Run # 2_V Piping Run # <br />iping Material: <br />DW FRP <br />DW FRP <br />DW FRP <br />ping Manufacturer <br />A.O. Smith <br />A.O. Smith <br />A.O. Smith <br />ping Diameter: <br />2" <br />2" <br />2" <br />Length of Piping Run: <br />50 FEET <br />30 FEET <br />30 FEET <br />Product Stored: <br />Antifreeze <br />Gear Oil <br />Motor Oil <br />Method and location of <br />iping-run isolation. <br />Test Boot @ STP <br />Sump <br />Test Boot @ STP <br />Sump <br />Test Boot @ STP <br />Sump <br />Wait time between <br />applying pressure/vacuum/water <br />and starting test <br />10 min. <br />10 min. <br />10 min. <br />Test Start Time: <br />2:20 <br />17:00 <br />18:00 <br />Initial Reading (R,) <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />3:20 <br />18:00 <br />19:00 <br />final Reading (RF) <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />60 min. <br />60 min. <br />60 min. <br />hange in Reading (R, -R,) <br />0 <br />0 <br />0 <br />ass/Fail Threshold or Criteria: <br />N/A <br />N/A <br />N/A <br />Test Result: <br />N Pass ❑ Fail <br />® Pass ❑ Fail <br />N Pass ❑ Fail <br />[]Pass ❑ Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up failed tests) <br />TCX7..(diene.l.waste)-product.lin.e..secon.da .y...not.tested..due..to...dal(naged.test................ <br />hoot.....Deed..to..repairl.reptlace ..... T.C.Y..7.ment.line..passed............ ........................ ......................_............................. <br />.TG.Y2..(..w.este..gill.p.r..aduct.liine..sec.ondm. v+ras-not..tested...due-to..darnaged..test......._..... <br />boot ... Need..to..rep.airlreplace...... TQY2..xent..linle. passed. ...................... ........... ............................................... ..... <br />
The URL can be used to link to this page
Your browser does not support the video tag.