Laserfiche WebLink
SWRCB, January 2002 Page 3 of 5 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By. <br />O Piping Manufacturer OO Industry Standard O Professional Engineer <br />O Other (Specify) <br />Test Method Used. <br />OO Pressure O Vacuum O Hydrostatic <br />O Other (Specify) <br />Test Equipment Used: 4-1/2 PRESSURE GAUGE JEquipment Resolution: +/_ 0.25% Accuracy <br />Piping Run # 1-P PipingRun# 7-V Piping Run # 2_V Piping Run # <br />iping Material: <br />DW FRP <br />DW FRP <br />DW FRP <br />ping Manufacturer <br />A.O. Smith <br />A.O. Smith <br />A.O. Smith <br />ping Diameter: <br />2" <br />2" <br />2" <br />Length of Piping Run: <br />50 FEET <br />30 FEET <br />30 FEET <br />Product Stored: <br />Antifreeze <br />Gear Oil <br />Motor Oil <br />Method and location of <br />iping-run isolation. <br />Test Boot @ STP <br />Sump <br />Test Boot @ STP <br />Sump <br />Test Boot @ STP <br />Sump <br />Wait time between <br />applying pressure/vacuum/water <br />and starting test <br />10 min. <br />10 min. <br />10 min. <br />Test Start Time: <br />2:20 <br />17:00 <br />18:00 <br />Initial Reading (R,) <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />3:20 <br />18:00 <br />19:00 <br />final Reading (RF) <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />60 min. <br />60 min. <br />60 min. <br />hange in Reading (R, -R,) <br />0 <br />0 <br />0 <br />ass/Fail Threshold or Criteria: <br />N/A <br />N/A <br />N/A <br />Test Result: <br />N Pass ❑ Fail <br />® Pass ❑ Fail <br />N Pass ❑ Fail <br />[]Pass ❑ Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up failed tests) <br />TCX7..(diene.l.waste)-product.lin.e..secon.da .y...not.tested..due..to...dal(naged.test................ <br />hoot.....Deed..to..repairl.reptlace ..... T.C.Y..7.ment.line..passed............ ........................ ......................_............................. <br />.TG.Y2..(..w.este..gill.p.r..aduct.liine..sec.ondm. v+ras-not..tested...due-to..darnaged..test......._..... <br />boot ... Need..to..rep.airlreplace...... TQY2..xent..linle. passed. ...................... ........... ............................................... ..... <br />