My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:44:43 PM
Creation date
11/8/2018 9:52:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
12/6/2016 12:58:59 AM
QuestysRecordID
3271591
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In February 2004, PSI proposed Blueline Technologies' Split Repair Boots for the repair and <br />rectification of the sump piping/conduit penetrations, as Blueline technologies reported this <br />product line to be UL -listed and approved. <br />Further investigation by SJCEHD and PSI determined the specific product(s) proposed to not <br />be covered by the UL file cited and provided by Blueline Technologies. Blueline responded with <br />a commitment to secure UL approval of the referent product as soon as possible. <br />In June 2004, to expedite the completion of SB -989 testing and achieve compliance, YRC (YTI) <br />commissioned PSI to revise the initially proposed scope of work for the repair and upgrade of <br />the UST sumps, to incorporate alternative options for non-destructive compliance upgrade of <br />the UST sumps, for which UL listed components are available. <br />PSI prepared and submitted the revised scope of work to SJCEHD for approval. In September <br />2004, PSI received approval by SJCEHD for the proposed scope of work and permit <br />application. <br />In October 2004, following the completion of the proposed scope of work for the installation of <br />penetration boots, PSI performed SB -989 testing of UST sumps, annular space, and product <br />line secondary containment piping. All line testing passed. All annular space testing passed. <br />The SOAP TANK sump passed. Six UST sumps failed. (see Secondary Containment Testing <br />_ Report Form, 10/26/2004) (Steven Shih, R.E.H.S., inspector) <br />In November 2004, following completion of sump repairs and fiberglass work, PSI performed <br />SB -989 testing of five (5) of the failed UST sumps. All sumps passed. (see Secondary <br />Containment Testing Report Form, 11/22/2004) (Michelle Le, R.E.H.S., inspector) <br />In December 2004, following the completion of sump repairs and fiberglass work on the <br />remaining UST, PSI performed SB -989 testing of the remaining UST sump. Sump testing <br />passed. (see Secondary Containment Testing Report Form, 12/2/2004) (Dennis Catanyag, <br />R.E.H.S., inspector) <br />Project Summary <br />As of December 2, 2004, Yellow Roadway Corporation (YRC) (formerly Yellow Transportation <br />Incorporated) (YTI) has successfully performed, completed, and passed all required SB -989 <br />testing procedures for the seven (7) existing active UST systems operated at the referent site. <br />Secondary Containment Testing Report Form(s) for the testing/inspection events described <br />herein are attached. <br />Please call with any questions or concerns you may have, or if PSI can be of additional service, <br />at (562) 597-3977, ext 211. We look forward to working with you on future projects. <br />Respectfully submitted, <br />PROFESSIONAL SERVICE INDUSTRIES, INC. <br />Michael Sills <br />Senior Project Manager <br />Professional Service Industries, Inc. <br />OF <br />
The URL can be used to link to this page
Your browser does not support the video tag.