Laserfiche WebLink
SWRCB. January 2002 <br />< nrnilv/` CiT11dD 'i'riCTTNf_ <br />*Md Page _ of <br />Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard X Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum X Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: LAKE TEST <br />SOAP SLOP <br />Equipment Resolution: . <br />SLOP <br />Sump Diameter. <br />42" <br />42" <br />42" <br />Sump Depth: <br />48" <br />48" <br />120" <br />Sump Material: <br />FHiERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />16" <br />14" <br />24" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />22" <br />24" <br />58" <br />Condition of sump prior to testing: <br />GOOD <br />GOOD <br />GOOD <br />Portion of Sump Tested' <br />24" <br />26" <br />60" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and «ester)' <br />Yes ❑ No X NA <br />Yes ❑ No XNA <br />Yes ❑ No X NA <br />❑ Yes ❑ Nor NA <br />Turbine shutdown response tithe <br />Is system programmed for fail-safe <br />shutdrnvn? <br />Yes ❑ No X NA <br />Yes ❑ No X NA <br />Yes ❑ No XNA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />Yes ❑ No X NA <br />Yes []No XNA <br />Yes ❑ No X NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressue/vawum/water and starting <br />test: <br />30 MIN <br />30 MIN <br />30 MIN <br />Test Start Time: <br />1:30 <br />1:30 <br />1:30 <br />Initial Reading (Pr): <br />24" <br />26" <br />60" <br />Test End Time: <br />1:30 <br />1:30 <br />1:30 <br />Final Reading (Re): <br />24" <br />10" <br />10" <br />Test Duration: <br />24 HR <br />24 HR <br />24 HR <br />Change in Reading (RF-Ril: <br />0 <br />16" <br />50" <br />Pass/Fail Threshold or Criteria: <br />0 <br />0 <br />0 <br />Test Result: <br />X Pass Fail <br />Pass .l' Fail <br />Pass X Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />X Yes ❑ No ❑ NA <br />X Yes ElNo ❑ NA <br />X Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing" <br />X Yes ❑ No [INA <br />X Yes ❑ No ❑ NA <br />X Yes ❑No ❑ NA <br />❑Yes ❑ No ❑ NA <br />` Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />SLOP I TANK IS A COLLAR FAILURE, SLOP 2 TANK SECONDARY PIPING HAS <br />BEEN CUT INSIDE SUMP AND NEW PIPING PENATRATIONS ARE NEEDED,ALSO <br />RE -FIBERGLASS OF COLLAR.MAY NEED TO EXCAVATE TO FIX PENATRATION <br />' if the entire depth of the sump is not tested, specify how much was tested If the answer to any of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />