My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:44:43 PM
Creation date
11/8/2018 9:52:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
12/6/2016 12:58:59 AM
QuestysRecordID
3271591
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB. January 2002 <br />< nrnilv/` CiT11dD 'i'riCTTNf_ <br />*Md Page _ of <br />Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard X Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum X Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: LAKE TEST <br />SOAP SLOP <br />Equipment Resolution: . <br />SLOP <br />Sump Diameter. <br />42" <br />42" <br />42" <br />Sump Depth: <br />48" <br />48" <br />120" <br />Sump Material: <br />FHiERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />16" <br />14" <br />24" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />22" <br />24" <br />58" <br />Condition of sump prior to testing: <br />GOOD <br />GOOD <br />GOOD <br />Portion of Sump Tested' <br />24" <br />26" <br />60" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and «ester)' <br />Yes ❑ No X NA <br />Yes ❑ No XNA <br />Yes ❑ No X NA <br />❑ Yes ❑ Nor NA <br />Turbine shutdown response tithe <br />Is system programmed for fail-safe <br />shutdrnvn? <br />Yes ❑ No X NA <br />Yes ❑ No X NA <br />Yes ❑ No XNA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />Yes ❑ No X NA <br />Yes []No XNA <br />Yes ❑ No X NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressue/vawum/water and starting <br />test: <br />30 MIN <br />30 MIN <br />30 MIN <br />Test Start Time: <br />1:30 <br />1:30 <br />1:30 <br />Initial Reading (Pr): <br />24" <br />26" <br />60" <br />Test End Time: <br />1:30 <br />1:30 <br />1:30 <br />Final Reading (Re): <br />24" <br />10" <br />10" <br />Test Duration: <br />24 HR <br />24 HR <br />24 HR <br />Change in Reading (RF-Ril: <br />0 <br />16" <br />50" <br />Pass/Fail Threshold or Criteria: <br />0 <br />0 <br />0 <br />Test Result: <br />X Pass Fail <br />Pass .l' Fail <br />Pass X Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />X Yes ❑ No ❑ NA <br />X Yes ElNo ❑ NA <br />X Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing" <br />X Yes ❑ No [INA <br />X Yes ❑ No ❑ NA <br />X Yes ❑No ❑ NA <br />❑Yes ❑ No ❑ NA <br />` Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />SLOP I TANK IS A COLLAR FAILURE, SLOP 2 TANK SECONDARY PIPING HAS <br />BEEN CUT INSIDE SUMP AND NEW PIPING PENATRATIONS ARE NEEDED,ALSO <br />RE -FIBERGLASS OF COLLAR.MAY NEED TO EXCAVATE TO FIX PENATRATION <br />' if the entire depth of the sump is not tested, specify how much was tested If the answer to any of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.