Laserfiche WebLink
s <br />r <br />S WRCB. January 2002 Page of <br />6. P1PT Nr C1 nL4P TFCTFNr <br />Test Method Developed By: 0 Sump Mamificturer 0 Industry Standard X Professional Engineer <br />0 Other (Specify) <br />Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: LAKE TEST <br />ANTIFREEZE GEAR 011, <br />Equipment Resolution: <br />MOTOR OIL <br />USED OIL <br />Sump Diameter: <br />42" <br />42" <br />42" <br />42" <br />Sump Depth: <br />48" <br />48" <br />60" <br />72" <br />Sump Material: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />14" <br />14" <br />16" <br />10" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />32" <br />32" <br />36" <br />42" <br />Condition of sump prior to testing: <br />GOOD <br />GOOD <br />GOOD <br />GOOD <br />Portion of Sump Tested' <br />34" <br />34" <br />38" <br />44" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)? <br />X Yes 0 No 0 NA <br />X Yes 0 No 0 NA <br />X Yes 0 No 0 NA <br />X Yes ❑ No 0 NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?' <br />Yes 0 No X NA <br />Yes 0 No X NA <br />Yes 0 No X NA <br />Yes 0 No X NA <br />Wasfail-safe verified to be <br />operational?' <br />Yes 0 No X NA <br />Yes 0 No X NA <br />Yes 0 No X NA <br />Yes 0 No X NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />30 MIN <br />30 N19N <br />30 MIN <br />30 MIN <br />Test Start Time: <br />1:30 <br />1:30 <br />1:30 <br />1:30 <br />Initial Reading (R,): <br />34" <br />34" <br />38" <br />44" <br />Test End Time: <br />1:30 <br />1:30 <br />1:30 <br />1:30 <br />Final Reading (114 <br />12" <br />12" <br />36" <br />16" <br />Test Duration: <br />24 HR <br />24 HR <br />24 HR <br />24 HR <br />Change in Reading (RF-Ri): <br />22" <br />22" <br />2" <br />28" <br />Pass/Fait Threshold or Criteria: <br />1 " <br />1" <br />1" <br />1" <br />Test Result: <br />Pass X Fail <br />Pass X Fail <br />Pass X Fail <br />❑ Pass X Fail <br />Was sensor removed for testing? <br />X Yes 0 No 0 NA <br />X Yes 0 No [INA <br />X Yes 0 No 0 NA <br />X Yes ❑ No 0 NA <br />Was sensor boner a replaced and <br />verified functional after testing? <br />X Yes 0 No 0 NA <br />X Yes 0 No 0 NA <br />X Yes EN. [INA <br />X Yes []No 0 NA <br />` COMMents —(include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br />ANTIFREEZE,GEAR OIL AND USED OIL ARE COLLAR FAILURES RE -FIBERGLASS NEEDED <br />AND MOTOR OIL IS ELECTRICAL CONDUIT FAILURE NEEDS TO BE RE -SEALED <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (s) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />