Laserfiche WebLink
r <br />r <br />r <br />r <br />r <br />r <br />r <br />r <br />r <br />r <br />r <br />r <br />r <br />SWRCB, January 2002 <br />4. PIP1NG STTMP TF.CTTN(_ <br />1./ <br />Page of <br />Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer <br />X Other (Specify) SWRCB <br />Test Method Used: Pressure Vacuum X Hydrostatic <br />Other (Specify) <br />Test Equipment Used: 24 HOUR LAKE TEST PERFORMED <br />Equipment Resolution: <br />Sump # motor oil Sump # waste oil <br />Sump # gear oil Sump # anti -freeze <br />Sump Diameter: 42" 42" <br />42" 42" <br />Sump Depth: <br />60" <br />72" <br />48" <br />48" <br />Sump Material: <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />FIBERGLASS <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />16" <br />10" <br />14" <br />14" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />36" <br />42" <br />32" <br />32" <br />Condition of sump prior to testing: <br />FAIR <br />FAIR <br />FAIR <br />FAIR <br />Portion of Sump Tested' <br />BOTTOM 38" <br />BOTTOM 44" <br />BOTTOM 34" <br />BOTTOM 34" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />Yes No x NA <br />Yes No x NA <br />Yes No x NA <br />Yes No X NA <br />product and water)? <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />shutdown? <br />Yes No xNA <br />Yes No xNA <br />Yes No xNA <br />Yes No XNA <br />Was fail-safe verified to be <br />operational? <br />Yes No xNA <br />Yes No x NA <br />Yes No x NA <br />Yes No X NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />30 MINUTES <br />30 MINUTES <br />30 MINUTES <br />30 MINUTES <br />test: <br />Test Start Time: <br />PERFORMED 24 <br />PERFORMED 24 <br />PERFORMED 24 <br />PERFORMED 24 <br />HOUR TEST <br />HOUR TEST <br />HOUR TEST <br />HOUR TEST <br />Initial Reading (Rt): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />24 hour <br />24 hour <br />24 hour <br />24 hour <br />Change in Reading (R, -R,): <br />None <br />None <br />None <br />None <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />X Pass 0 Fail <br />X Pass 0 Fail <br />X Pass 0 Fail <br />X Pass 0 Fail <br />Was sensor removed for testing? <br />x Yes No NA <br />x Yes No NA <br />x Yes No NA <br />x Yes No NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />x Yes No NA <br />x Yes No NA <br />x Yes No NA <br />x Yes No NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />V <br />