Laserfiche WebLink
` SWRCB, January 2002 ti 2 , �"o Page of <br />5. PIPING SUMP TESTING <br />r <br />r <br />r <br />r <br />b. <br />Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer <br />X Other (Specify) <br />Test Method Used: Pressure Vacuum X Hydrostatic <br />Other (Specify) <br />Test Equipment Used: 24 HOUR LAKE TEST PERFORMED <br />Equipment Resolution: <br />Sump # emergency <br />Sump # <br />Sump # <br />Sump # <br />spill tank <br />Sump Diameter: 42" <br />Sump Depth: <br />48" <br />Sump Material: <br />FIBERGLASS <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />14" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />24" <br />Condition of sump prior to testing: <br />FAIR <br />Portion of Sump Tested <br />BOTTOM 26" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />Yes No x NA <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />product and water)? <br />Turbine shutdown response time <br />N/A <br />Is system programmed for fail-safe <br />shutdown?* <br />Yes No x NA <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Was fail-safe verified to be <br />operational? <br />Yes No x NA <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />30 MINUTES <br />test: <br />Test Start Time: <br />PERFORMED 24 <br />HOUR TEST <br />Initial Reading (R,): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />24 HOUR <br />fa <br />Change in Reading (RF -Ra): <br />NONE <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />X Pass 0 Fail <br />❑ Pass 0 Fail <br />0 Pass 0 Fail <br />0 Pass 0 Fail <br />Was sensor removed for testing? <br />x Yes No NA <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />x Yes No NA <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />` ' If the entire depth of the sump is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or `NA", the entire sump must be tested. (See SWRCB LG -160) <br />r <br />