Laserfiche WebLink
October 5, 2004 <br />Professional Service Industries <br />Attn: Michael Sills <br />3960 Gilman Street <br />Long Beach, CA 90815 <br />Fax: (562) 597-8459 <br />Re: 1535 E. Pescadero Avenue, Tracy — Yellow Transportation, Inc. — SR0037272 <br />The permit application to retrofit UST for SB989 testing dated on September 20, 2004 and <br />February 6, 2004 at the above referenced location has been approved with following conditions: <br />1. Contact the local fire department and San Joaquin Valley Air Pollution Control District for <br />applicable permits and requirements. <br />2. Any changes in information or scope of work must be submitted to EHD prior to <br />commencing work. <br />3. All piping and connections including entry boots shall bear an UL label as provided in the <br />cut sheet. <br />4. All equipment in contact with backfill must have corrosion protection. <br />5. Contact Steven C. Shih at (209) 468-9850 to arrange inspection appointments; 48-hour <br />notice for inspection appointments is required. Contact EHD for the following inspections: <br />(a) Primary piping: pressure and soap test. <br />(b) Secondary piping: pressure and soap test. <br />(c) Piping slope: all piping must slope to a containment sump with an audible and visual <br />alarm. <br />(d) 24-hour lake test on sumps. <br />l (e) Check valve inspection: show the location of check valve to determine the types of <br />suction system. <br />(f) Final inspection. A final inspection must be performed prior to returning this station to <br />C" operation. <br />(i) A third party certified piping line tightness test must be performed immediately <br />after the completion of work and results received by this office within 7 days and <br />prior to the final inspection. <br />(ii) Submit an As -Built plan to EHD at the time of the final inspection if there is any <br />changed in reference to the original approved plan. Note: A final inspection will <br />not be performed unless the as -built is submitted. <br />Page 1 of 2 <br />ENVIRONMENTAL HEALTH�EPARTMENT <br />SAN JOAQUIN COUNTY <br />Donna K Heran, RE.H.S. <br />Director 304 East Weber Avenue Third Floor <br />Unit Supervisors <br />Carl Bor gman, R.E.H.S. <br />At Olsen, R.E.H.S. Stockton, California 95202-2708 <br />Mike Huggins, R.E.H.S., R.D.I. <br />_ <br />'v• <br />Program Manager <br />Laurie A. Corolla, RE.H.S. Telephone: (209)46H-3420 <br />Douglas W. Wilson, R.E.H.S. <br />Margaret Lagorio, R.E.H.S. <br />Program Manager Fax: (209) 464-0138 <br />Robert McClellon, R.E.H.S. <br />Mark Barcellos, R.E.H.S. <br />October 5, 2004 <br />Professional Service Industries <br />Attn: Michael Sills <br />3960 Gilman Street <br />Long Beach, CA 90815 <br />Fax: (562) 597-8459 <br />Re: 1535 E. Pescadero Avenue, Tracy — Yellow Transportation, Inc. — SR0037272 <br />The permit application to retrofit UST for SB989 testing dated on September 20, 2004 and <br />February 6, 2004 at the above referenced location has been approved with following conditions: <br />1. Contact the local fire department and San Joaquin Valley Air Pollution Control District for <br />applicable permits and requirements. <br />2. Any changes in information or scope of work must be submitted to EHD prior to <br />commencing work. <br />3. All piping and connections including entry boots shall bear an UL label as provided in the <br />cut sheet. <br />4. All equipment in contact with backfill must have corrosion protection. <br />5. Contact Steven C. Shih at (209) 468-9850 to arrange inspection appointments; 48-hour <br />notice for inspection appointments is required. Contact EHD for the following inspections: <br />(a) Primary piping: pressure and soap test. <br />(b) Secondary piping: pressure and soap test. <br />(c) Piping slope: all piping must slope to a containment sump with an audible and visual <br />alarm. <br />(d) 24-hour lake test on sumps. <br />l (e) Check valve inspection: show the location of check valve to determine the types of <br />suction system. <br />(f) Final inspection. A final inspection must be performed prior to returning this station to <br />C" operation. <br />(i) A third party certified piping line tightness test must be performed immediately <br />after the completion of work and results received by this office within 7 days and <br />prior to the final inspection. <br />(ii) Submit an As -Built plan to EHD at the time of the final inspection if there is any <br />changed in reference to the original approved plan. Note: A final inspection will <br />not be performed unless the as -built is submitted. <br />Page 1 of 2 <br />