My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:44:43 PM
Creation date
11/8/2018 9:52:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
12/6/2016 12:58:59 AM
QuestysRecordID
3271591
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electrical Conduit <br />In order to permit boot installation, the electrical conduit(s) will cut, inside of the piping <br />sump. Prior to conduit cutting activities, PSI will disconnect the perspective UST <br />monitoring system. Electrical seal offs within sumps will be removed and replaced, as <br />needed. Low -voltage wiring will be pulled back, and restored following boot installation. <br />Conduit will be re -threaded, and fit with Class 1, Division 1, three-piece unions, to <br />permit, and simplify, any future maintenance work. <br />Following the completion of the activities proposed herein, PSI will proceed with the SB - <br />989 testing of each of the UST and piping systems. <br />PSI will schedule each inspection phase directly with the designated SJCEHD <br />representative a minimum of 48 hours prior to the scheduled test date(s). <br />Additional work required beyond this scope of services presented in this work plan will <br />not be performed without prior review and written approval by SJCEHD. <br />Permit Application: <br />PSI has prepared and enclosed the following items for the procurement of UST <br />upgrade and SB -989 testing permits: <br />• SJCEHD Application for Underground Tank Retrofit/Piping Repair Permit <br />• SJCEHD Service Request Application <br />• SJCEHD Underground Storage Tank Program Fee Worksheet <br />• Letter of Authorization, Yellow Roadway Corporation for Professional Service <br />Industries <br />• Site Plan (2) Copies — Subject Property, Locations of Existing USTs <br />• Blueline Technologies 2004 Product Information Catalog <br />• Permit Application Fees Check, for $279.00 USD, Payable to SJCEHD <br />Please call with any questions or concerns you may have, or if PSI can be of additional <br />service, at (562) 597-3977, ext 211. We look forward to working with you on this and <br />future projects. <br />Respectfully submitted, <br />PROFESSIONAL SERVICE INDUSTRIES, INC. <br />Michael Sills <br />Senior Project Manager <br />Professional Service Industries, Inc. <br />September 20, 2004 <br />NCS Yellow Roadway Corporation <br />SJCEHD Permit Application Submittal <br />Pagc 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.