Laserfiche WebLink
SWRc B, January 2002 <br />v <br />9 SPILL / OVERFILL CONTAINMENT BOXES <br />Page 2 of 3 <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />O Piping Manufacturer OO Industry Standard <br />O Other (Specify) <br />O Professional Engineer <br />Test Method Used: <br />O Pressure <br />O Other (Specify) <br />O Vacuum <br />OO Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box # T-4 <br />Spill Box # T.2 <br />Spill Box # T_3 <br />Spill Box # T.4 <br />Bucket Diameter: <br />24" <br />24" <br />24" <br />24" <br />Bucket Depth: <br />21 <br />21^ <br />21" <br />21" <br />Wait time between applying <br />pressure/vacuum/water and <br />farting test: <br />10 min. <br />10 min. <br />10 min. <br />10 min. <br />Test Start Time: <br />1:30 <br />1:30 <br />1:30 <br />1:30 <br />Initial Reading (R,) <br />4.5" <br />7 1/4" <br />8" <br />4 1/4" <br />Test End Time: <br />2:30 <br />2:30 <br />2:30 <br />2:30 <br />Final Reading (RF) <br />4.5" <br />7 1/4" <br />8" <br />41/4" <br />Test Duration: <br />60 min. <br />60 min. <br />60 min. <br />60 min. <br />hange in Reading (RF -R,) <br />0 <br />0 <br />0 <br />0 <br />ass/Fail Threshold or Criteria: <br />Pass <br />Pass <br />Pass <br />Pass <br />est Result: <br />IN Pass []Fall <br />X Pass ❑ Fail <br />10 Pass ❑ Fail <br />X Pass ❑ Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up failed tests) <br />All.. spilt..contain.nt�ents..24°' 1.°'..A� .;x...hydr.0..;Matic..tosxa..............................................................................._............ <br />