Laserfiche WebLink
SWFr�B, January 2002 Page 3 of 3 <br />9 SPILL / OVERFILL CONTAINMENT BOXES <br />Not EquippedWith Spill/Overfill Containment Boxesill <br />Containment Boxes are Present, but were Not Tested ❑ <br />FestMethod <br />Developed By: <br />O Piping Manufacturer OO Industry Standard <br />O Professional Engineer <br />O Other (Specify) <br />Test Method Used: <br />O Pressure <br />O Vacuum <br />OO Hydrostatic <br />O Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />Spill Box # T-5 <br />T.Spill <br />Box # <br />Bucket Diameter: <br />24" <br />7TTY <br />Bucket Depth: <br />21" <br />Wait time between applying <br />pressure/vacuum/water and <br />10 min. <br />starting test: <br />Test Start Time: <br />2:40 <br />3:15 <br />Initial Reading (R,) <br />5" <br />5" <br />Test End Time: <br />3:40 <br />4:15 <br />Final Reading (RF) <br />5" <br />5" <br />Test Duration: <br />60 min. <br />60 min. <br />Change in Reading (RF -R,) <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />Pass <br />Pass <br />est Result: <br />IN <br />Pass ❑ Fail <br />❑ Pass ❑Fail <br />®Pass ❑Fail <br />❑ Pass ❑ Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up failed tests) <br />Ta.n.k.#.6..Docs..n.ot..haxe...a--- spill ... conitainmen.t...4"..Riser..contain-with.i.n...a..s.u.m.p................... <br />Tank.# .6..has..a..rem ate..filI......................................................................................................................................................................................... <br />