Laserfiche WebLink
SAN JOAQ% _OUNTY ENVIRONMENTAL HEAL] ""So <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE SolI <br />YPE OF ACTION 5ZI. NEW PLAN ❑ 2. CHANGE OF INFORMATION <br />:ARTMENT <br />PLAN TYPE MONITORING IS IDENTICAL FOR ALL US Is A I I h1b rAt.tla r I. <br />(Check one item only) THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILIT3Y.INFORNIATION <br />FACILITY ID # (Agency Use Only)-- <br />qq >y <br />FACILITY NAME Q '(1:*1- <br />FACILITY SITE ADDRESS -G E P5'�� AIt:E Mm CITY s F,�+C <br />II. EQUIPMENT TESTING AND PREiVENTIVErMAINTENANCE p <br />State law requires that testing, preventive rnamtenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc. be erformed in <br />accordance with the equipment manufacNrers' instructions, or annually, whichever is more frequent. Such work must be performed by qualified personnel. <br />MONITORING EQUIPMENT IS SERVICED 1. ANNUALLY ❑ 99. OTHER (Specify): <br />= III. MONITORING:LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locanons where monitoring is performed (i.e., location of each sensor.. <br />etc.). If you already have a diagram <br />line leak detector, monitoring system control panel, m (e.g., current UST Monitoring Site Plan from a Monitoring System Ceruficauo <br />form Hazardous Materials Business Plan map etc) which shows all required 'information, include it with this Ian. <br />IV. TANK MONITORING <br />M, <br />MONITORING IS PERFORMED USING THE FOLLOWING METHUD(S): (Check all that apply) <br />i. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) " <br />SECONDARY CONTAINMENT IS: ❑ a. DRY I b. LIQUID FILLED • ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />� PANEL MANUFACTURER: M12. MODEL#: , <br />LEAK SENSOR MANUFACTURER: \ M1L. MODEL#(S): �•i�• "gip,.. <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SiNGI E WALL TAN K(Sl <br />MODEL #: <br />PANEL MANUFACTURER: <br />444 MIe. MODEL #(S): M1� <br />IN -TANK PROBE MANUFACTURER: .11"fl .. UILGVr V <br />LEAK TEST FREQUENCY: <br />❑ a. CONTINUOUS <br />1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyTRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />❑ d. MONTHLY <br />PROGRAMMED TESTS: <br />❑ a. 0.1 g.p.h. ❑ b. 0.2 g.p.h. <br />❑ 3. INVENTORY RECONCILIATION <br />❑ & MANUAL PER 23 CCR §2646 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: <br />❑ a. 36 HOURS <br />❑ -5. INTEGRITY TESTING PER 23 CCR §2643.1 <br />TEST FREQUENCY: ❑ a. ANNUALLY <br />❑ 6 VISUAL MONITORING DONE: ❑ a. DAILY <br />❑ 99. OTHER (Specify): <br />vr.,vn.e.e .-+ <br />e. OTHER (Specify): <br />c. OTHER (Specify): <br />b. STATISTICAL PER 23 CCR §2646.1 <br />❑ b. 60 HOURS <br />❑ b.BIENNIALLY ❑ c. OTHER (Specify): <br />❑ b. WEEKLY (Requires agency eoseovaq <br />M'1 <br />M22 W. <br />I, <br />N]S <br />W6 AP-: <br />M NITORING IS PERFORMED USING THE,FOLLOWING METHOD(S) (Check all that apply) <br />1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyTRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />�( <br />SECONDARY CONTAfNMENT I� Z a. Y ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />sue. 8S <br />gt3 <br />Y <br />M. <br />,S:: <br />PANEL MANUFACTURER: � r _ MODEL#: <br />Mla <br />_ <br />LEAK SENSOR MANUFACTURER: MODEL <br />❑ a. YESb. NO <br />s„- <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN? <br />`L <br />WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES b. NO <br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />- <br />OF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED MJe MODEL #(S): <br />M2- <br />M LLD MANUFACTURER(s): <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />Ma. <br />ELLD MANUFACTURER: Met'. MODEL#: <br />Mt. <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. <br />WILL ELLD DETECTION OF A PIPING.LEAKTRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />Mrs <br />. <br />WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />uy <br />❑ 4. INTEGRITY TESTING M45 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) <br />Mu <br />❑ 5.VISUAL MONITORING DONE: ❑ a. DAILY ❑ S. WEEKLY' ❑ c. M03. MONTHLY & EACH TIME SYSTEM OPERATED'* <br />• ” Allowed for momlo. IS o[unburid evwgercy aenano, fuel piping only M HSC §25281 <br />Mn <br />51613, <br />Regwnes aae^ry approva <br />A 6, PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR ETT:" "PTIO'- ,"ROM MON'.OR1NG PER 23 CCR §2636(a)(3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(, <br />❑ 99.OTHER (Specify)-- <br />07/23/03 <br />SJCEHD-d (07/03) -1/4 <br />