Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 2 <br />MONITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THF•i')LLOWING METHOD(S) (Check all that apply) <br />❑ L CONTINUOUS ELECTRONIC MONITORING 0F UNDER DISPENSER CONTAINMENT (UDC) vt <br />_ <br />PANEL MANUFACTURER: MSL MODEL#: <br />LEAK SENSOR MANUFACTURER: msa. MODEL#(S): <br />M.. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a. YES ❑ b. NO <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b.NOMS6 <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? C]a. YES ❑ b. NO MS_ <br />❑ 2. MECHANICAL ASSEMBLY (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br />M58_ MODEL #(S): MSs <br />ASSEMBLY MANUFACTURER: MM <br />❑ 3.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY (RN.. iz-c )pro aU <br />X4. NO DISPENSERS Mc: <br />❑ 99. OTHER (Specify) <br />VH-. ENHANCED LEAK:DETECTION <br />❑ 1. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK mm <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />VIII. TRAINING <br />It DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) mac <br />1 THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />4 <br />3. THE FACILITY'S BEST MANAGEMENT PRACTICES (Required as of 7/1/2004) <br />4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />6. <br />STATISTICAL INVENTORY RECONCILIATION" <br />7. ❑ SWRCB PUBLICATION: "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />qtr <br />99. ❑ OTHER (Specify) <br />Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to theirjob duties and can access those documents when needed. <br />By July 1. 2004, this facility will have a "Designated UST Operator" who has passed the operator exam administered by the International Code Council (ICC). By Jul_% <br />1, 2004, and annually thereafter, the "Designated UST Operator' will train facility employees in the proper operation and maintenance of the UST systems. This <br />training will include, but is not limited to, the following: <br />> Operation of the UST systems in a manner consistent with the facility's best management practices. <br />➢ The facility employee's role with regard to the leak detection equipment. <br />➢ The facility employee's role with regard to spills and overfills. <br />D Whom to contact for emergencies and leak detection alarms. <br />. <br />For facility employees hired on or after July 1, 2004, the initial training will be conducted within 30 days of the date of hire. _ <br />IX. COMMENTS/ADDITIONAL INFORMATION <br />Please use this section to include any additional UST system monitoring -related information (e.g., additional information required by your local agency): 't*` <br />X. PERSONNEL RESPONSIBILITIES <br />AS OF 7/12004, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION IB OF THE CURRENT UST OPERATING PERMIT APPLICATION - <br />FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br />"S <br />EQUIPMENT COVERED BY THIS PL D WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY <br />UST SYSTEMS IN ACCORDANCE dTH CCR § 2715 b. <br />M. OWNER/OPERATOR SIGNATURE <br />CERTI T N: I certi at e ' formation provided herein is true and accurate <br />to the best of my knowledge. <br />O RP TOR SIG RESEN <br />DATE: M. <br />er mvo. <br />Operator <br />_ <br />OWN R/OPERATOR AME riot): <br />OWNER/OPERATOR TITLE:_ <br />gtv0Z <br />12TlV l <br />(Agency Use Only) Thisplanhas reviewed and: Approved ❑ Approved With Conditions ❑ Disapproved <br />rben <br />K,t. i� Date: r -'v7 -O7 <br />Laval Agency Signature: i — <br />Comments/Special Conditions- <br />SJCEHD-d (07/03) -3/4 <br />