Laserfiche WebLink
SWRCB, January 2002 Page 1 of 5 <br />Seconda'Fy Containment Test Report Foirm <br />This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br />appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />4 cern ITV INFf1RMATIAN <br />acility Name. Yellow Transportation TCY Date of Testing: 11-7-2007 <br />acility Address: 1535 E. Pescadero Ave. Tracy CA 95376 <br />acility Contact: hris Roy jPhone: 209-833-1300 <br />Date Local Agency Was Notified of Testing: 11-5-2007 <br />ame of Local Agency Inspector (if present during testing) lNot Present <br />Company Name: Slunaker Construction <br />Technician Conducting Test: Paulo Magana <br />redentials: O CSLB Licensed Contractor O SWRCB Licensed Tank Tester <br />License Type-. <br />icense Number: 03-1644 <br />Manufacturer Training <br />Manufacturer Component(s) Date Training Expires <br />INCON TS -STS FRANKLIN FUELING 3-6-2009 <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />3. SUMMARY OF TEST RESULTS <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Component <br />Pas <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />CY1 SOAP Fill Sump <br />® <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />CY1 SOAP Spill Bucket <br />® <br />❑ <br />❑ <br />❑ <br />TCY2 Waste Oil Ann. <br />❑ <br />❑ <br />® <br />❑ <br />CY1 SOAP Sec. product line <br />® <br />❑ <br />❑ <br />❑ <br />TCY2 Sec. vent line <br />® <br />❑ <br />❑ <br />❑ <br />CY1 Soap Tank Annular <br />® <br />❑ <br />❑ <br />❑ <br />TCY2 Sec. product line <br />❑ <br />❑ <br />® <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />TCY2 Waste Oil Fill Sump <br />❑ <br />I ❑ <br />® <br />1 ❑ <br />CY7 DSL WAS. Fill <br />® <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />CY7 DSL WAS. Sp Buc. <br />® <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />CY7 Sec. vent line <br />® <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />CY7 Sec. product line <br />❑ <br />❑ <br />® <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />CY7 DSL Waste Ann. <br />❑ <br />❑ <br />® <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />.T.GY..ZLnr�te..ail1...�..xlKX:l..ldiesel.wastel.ace.pcin�flled..fa.W. F1i.P...1anKst..aod..ther,ztrart".tlxe.annulsrs.are..P..xlraA.t........ <br />fr.9m..t�sting <br />........................ .......... ...................... .............. ............ ................................... ............ ...... ........................................ ............ ............ ............. .............. <br />Inst. wxater..li:tt.oa�i.i rf .SS.9aICam.drums............................. ............ ................................... ............ .................................... ....................................... <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the fads stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature i'' Date: 11-7-2007 <br />