My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2010 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:08:46 PM
Creation date
11/8/2018 9:52:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2011
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2010 - 2011 .PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2011
QuestysRecordDate
12/7/2016 6:42:09 PM
QuestysRecordID
3273248
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' v4./ �" Page_of— <br /> S W RCB,January 2002 <br /> 5. SECONDARY PIPE TESTING - <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) _ <br /> Test Method Used: X Pressure ❑Vacuum 11 Hydrostatic <br /> ❑Other(Specify) - <br /> Test Equipment Used: Pressure Gauges in PSI/Nitrogen Equipment Resolution: I/10-15 PSI <br /> MEN-Mai <br /> Piping Run#5 Piping Run#6 Piping Run 07 Piping Run <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 4" 3" - <br /> Length of Piping Run: Approx. 30' Approx.455' Approx. 35' _ <br /> Product Stored: Motor Oil Waste Oil Wash solvent <br /> Method and location of fest boot at Test boot at Test boot at <br /> i in -run isolation: liping Sump#5 Piping Sump#6 Piping Sump#7 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes <br /> pressure and startin test: -- <br /> Test Start Time: 9:45 9:55 11:30 _ <br /> Initial Reading(Ri): 3 PSI 3 PSI 3 PSI _ <br /> Test End Time: 10:45 10:55 12:30 <br /> Final Reading(RF): 3 PSI 3 PSI 3 PSI <br /> Test Duration: I Hour I Hour I Hour <br /> Change in Reading(RF-Ri): 0 PSI 0 PSI 0 PSI <br /> Pass/Fail Threshold or No Loss in PSI No Loss in PSI No Loss in PSI <br /> Criteria: <br /> Test Result: X Pass Fail X Pass Fail X Pass ❑ Fail Pass Fail <br /> Comments-(include information on repairs made prior to testing and recommended follow-up for failed tests) _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.