Laserfiche WebLink
' v4./ �" Page_of— <br /> S W RCB,January 2002 <br /> 5. SECONDARY PIPE TESTING - <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) _ <br /> Test Method Used: X Pressure ❑Vacuum 11 Hydrostatic <br /> ❑Other(Specify) - <br /> Test Equipment Used: Pressure Gauges in PSI/Nitrogen Equipment Resolution: I/10-15 PSI <br /> MEN-Mai <br /> Piping Run#5 Piping Run#6 Piping Run 07 Piping Run <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 4" 3" - <br /> Length of Piping Run: Approx. 30' Approx.455' Approx. 35' _ <br /> Product Stored: Motor Oil Waste Oil Wash solvent <br /> Method and location of fest boot at Test boot at Test boot at <br /> i in -run isolation: liping Sump#5 Piping Sump#6 Piping Sump#7 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes <br /> pressure and startin test: -- <br /> Test Start Time: 9:45 9:55 11:30 _ <br /> Initial Reading(Ri): 3 PSI 3 PSI 3 PSI _ <br /> Test End Time: 10:45 10:55 12:30 <br /> Final Reading(RF): 3 PSI 3 PSI 3 PSI <br /> Test Duration: I Hour I Hour I Hour <br /> Change in Reading(RF-Ri): 0 PSI 0 PSI 0 PSI <br /> Pass/Fail Threshold or No Loss in PSI No Loss in PSI No Loss in PSI <br /> Criteria: <br /> Test Result: X Pass Fail X Pass Fail X Pass ❑ Fail Pass Fail <br /> Comments-(include information on repairs made prior to testing and recommended follow-up for failed tests) _ <br />