Laserfiche WebLink
N./ y Page_of <br /> SWRCB,January 2002 <br /> 6. PIPING SUMP TESTING - <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) -- <br /> Test Method Used: <br /> ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump#5 Sump#6 Sump#7 Sump# <br /> Sump Diameter: <br /> 42" 42" 42" — <br /> Sump Depth: <br /> 66" 68" 47" — <br /> Sump Material: Fiberglass Fiberglass Fiberglass _ <br /> Height from Tank Top to Top of 31„ 19" 23" <br /> Highest Pi in Penetration: --- <br /> Height from Tank Top to Lowest 14„ 12" 24" <br /> Electrical Penetration: ---� <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' Water Level 33" Water Level 21" Water Level 26" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes ❑No X NA Yes ❑No XNA Yes ❑No XNA ❑Yes ❑No [INA <br /> roduct and water)?. - <br /> Turbine shutdown response time N/A N/A NIA - <br /> Is system programmed for fail-safe Yes ❑No X NA Yes 0 N XNA Yes 0 N XNA ❑Yes ❑No ❑NA <br /> shutdown? <br /> Was fail-safe verified to be Yes No XNA Yes No XNA Yes No XNA ❑Yes ONO DNA <br /> operational?* <br /> Wait time between applying water 5 Minutes 5 Minutes 5 Minutes <br /> and starting test: <br /> Test Start Time: 9:45 10:05 11:40 <br /> Initial Reading(Re): .001 .001 .001 <br /> Test End Time: 10:15 10:35 12:10 _ <br /> Final Reading(RF): .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: X Pass ❑Fail X Pass ❑Fail X Pass ❑Fail ❑ Pass ❑ Fail— <br /> Was sensor removed for testing? X Yes O No ❑NA X Yes ❑No DNA X Yes ❑No O NA ❑Yes []No ❑NA --Was sensor properly replaced and X Yes O No ❑NA X Yes ❑No ❑NA X Yes ❑No ❑NA O Yes ❑No NA ylN <br /> verified functional after testin ? <br /> Comments— (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />