Laserfiche WebLink
CONTAINMENT <br /> SOLUTIONS <br /> PLEASE REVIEW THE FOLLOWING INFORMATION AND FORWARD TO <br /> YOUR FIELD SUPERVISOR TO AVOID DELAYS . ANY DELAYS ON SITE DUE <br /> 'I'O PERBONNTL OR TANK(S) N07'PREPARED PROPERLYWILL INCREASE; <br /> JOB COST. <br /> Under noun t T o+k Frorij for insirecrian or remnnnfacnrrfne Page I of <br /> I, Reit cc or sI-tor s es ofexcavati pad will not t d.crmine, and matcrial will <br /> + n gr to into caval d hole (p • STHAA .'tandarc 6. "(1 quo 19_�. �) <br /> F'r n ill 11 h en rlc r will require to hall ,(the cndcap di tete exposed, <br /> Th arca excavat sh( tld start wl re the end •sp begins to urve do award. tg <br /> (1oA n 4' and b - 6', a d 8' wi . MUST FIV OPE SHORED TO 'ET <br /> OS A ST ARDS 926. . 0 through 1920.6- . ee page 3) <br /> OR - <br /> Enin+through existing waretvar• –already installed in tmik. will require the <br /> removal of all pulps or vents or piping installed (if any) in manway lid. T'he Bill 2?" <br /> diameter manway opening will be utilized for tank entry, so it cannot be obstructed in <br /> any way. I.00sen the bolts on the manway cover before the technician a.nives on site, <br /> but keep cover on feu safely. <br /> 2. lank must be empty of fuel ( within 1."of bottom of tank ) -Noe: The Technician <br /> will.vent the tank to atmosphere to lower explosion levels ill the ullik to less than /0% <br /> LEL. Get the tank as empty as Ixissible. The more product removed from the lank—WT <br /> reduce (be time required by the technician to vent. <br /> 3. An open top 55 gallon&Q.T drum must be provided lbr Technician's use tier <br /> removing or soaking up any residual product left in the tank. This drum is considered <br /> hazardous waste. and will be the responsibility of the owner or contlaeto r to dispose of <br /> accordingly. if the tank is extremely dirty. you may be required to contract the services <br /> of a tank cleanin. compam. <br /> (continued on next. page) <br />