My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2010 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:08:46 PM
Creation date
11/8/2018 9:52:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2011
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2010 - 2011 .PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2011
QuestysRecordDate
12/7/2016 6:42:09 PM
QuestysRecordID
3273248
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. A safety person must be available to assist (lac .l'echniciatt at all titnes. This person <br /> `. must be clean shaven (fir respirator) and able to speak English. This person must have <br /> no other duties other than assisting and monitoring the Techrtician. This person is <br /> supplied by the owner or contractor. The same sataty person should be assigned cacti <br /> day. This Will minimize the time required instrucling the safety pa-son on proper <br /> procedures and policies. <br /> NOTE. The ,safety person MUST have completed 40 HOURS OF TRAINING IN <br /> TILE FIELD APPLICATIONS OF HEALTU AND SAFr4,]'V IN COMPLIANCE <br /> WITH OSHA 29 CPR 1910.120 (HAZWOPER). <br /> 5, A'o T'rrel deliveries can be inade to any (atilt onsite while the 1"echnician is inside a <br /> tank. <br /> G. when tank entry is required by the Techatician. a person trained in C:PR mw;t be <br /> beside the entry hole at all times when the Technician is inside the tank. 'This person <br /> is in addition to the safety person. If one.is not available fixnn the contracting crew. <br /> an off duty fireman, nurse, EMT, or equivalent is acceptable. Besides administecing <br /> CPR, the person will assist the safety person should an emergency rescue be required. <br /> 7. Out,Technician will perform an air/soap tightness test confirming his repairs to the <br /> exterior of tank. and possibly identify any other poleutial problems on the exposed <br /> areas of the tattle. All efforts must be made to isolate. disconnect, or plug all the piping <br /> on tank. if this test is done, and at a later date another problem with the tank is <br /> identified, it will he the financial responsibility of the owner or contractor to schedule <br /> a return trip to the site. <br /> R. It is important that the contractor or owner contact the appropriate local and state <br /> authorities lbr regulations concerning the jobsitc. Jobsite permits may need to be <br /> obtained for the excavtttion or remanufactilre of the tank. Permils rrrusi be abtained <br /> by tine owner/contractor prior to our arrh al. Rek;ulatians governing testing of <br /> underground tanks should he determined so Technician can be advised. r <br /> 9. The contractor must disconnect the electrical supply and remove the pump from the <br /> tank. The product line at the pump must also be disconnected or capped. This will <br /> insure no fuel can enter the tank while Technicim) is working. <br /> I0. The water table in the tank hole must be controlled of all times. The Technician is <br /> unable to remanu:facture interior or exterior surfaces if they are wet. Controlling the <br /> water table will also prevent the tank from Floating. <br /> I I., It may be required, Por Tanks to be entered to be triple rinsed prior to <br /> 'Technician's arrival. Check with local regulators to see if required. <br /> v cllll'Y ltPO <br />
The URL can be used to link to this page
Your browser does not support the video tag.