My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2010 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 2:08:46 PM
Creation date
11/8/2018 9:52:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2011
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2010 - 2011 .PDF
QuestysFileName
COMPLIANCE INFO 2010 - 2011
QuestysRecordDate
12/7/2016 6:42:09 PM
QuestysRecordID
3273248
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 3 <br /> *%�. SECONDARY PIPE TESTING <br /> Test Method Developed By: FR Tank Manufacturer Industry Standard F-1 Professional Engineer <br /> Other (Specify) <br /> Test Method Used: ❑X Pressure Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used:gauge Equipment Resolution: •2Opsi <br /> Piping Run# 1 WAS Piping Run# 2 WAS FIELD Piping Run# 3 ART Piping Run# 4 GEA <br /> Piping Material: dwfiberglass dwfiberglass dwfiberglass dwfiberglass <br /> Piping Manufacturer: smith smith smith smith <br /> Piping Diameter: 311 311 311 311 <br /> Length of Piping Run: 10, 10, 3 0 ' 30- <br /> Product <br /> 0'Product Stored: WASTE OIL WASTE OIL ANTIFREEZE GEAR OIL <br /> Method and location of sump sump sump sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min 5min 5min <br /> starting test: <br /> Test Start Time: 15:40 14:00 10:00 10:00 <br /> Initial Reading(F4 3psi 3psi 3psi 3psi <br /> Test End Time: 16:40 15:00 11:00 11:00 <br /> Final Reading(RF ): 3psi 3psi 3psi 3psi <br /> "Threshold <br /> 1hr lhr 1hr 1hr <br /> It, ): 0 0 0 0 <br /> o 0 0 0 <br /> Pass ❑ Fail 0 Pass ❑ Fail ]Pass ❑ Fail x❑Pass El Fail <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> motor oil, t-6 waste oil, and soap sumps and secondry lines were not tested due to bad <br /> boots <br />
The URL can be used to link to this page
Your browser does not support the video tag.