Laserfiche WebLink
SWRCB,January 2002 Page 4- <br /> 6. PIPING SUMP TESTING �./ <br /> Test Method Developed By: ❑ Sump Manufacturer Industry Standard ❑X Professional Engineer <br /> 0 Other (Specify) <br /> Test Method Used: ❑ Pressure ❑ Vacuum Hydrostatic <br /> D Other (Spec) <br /> Test Equipment Used: vplt Equipment Resolution: +-.002" <br /> Sump# 1 WAS Sump# 1 WAS Sump# 3 ANT Sump# 4 GEA <br /> Sump Diameter: 48" 48" 48" 481- <br /> Sump <br /> 8"Sump Depth: 56" 124" 73" 73" <br /> Sump Material: fiberglass fiberglass fiberglass fiberglass <br /> Height from Tank Top to Top of 18" 26" 36" 36" <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 58" 23" 10" 10" <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good good good <br /> Portion of Sump Tested: t 20" 28" 38" 38" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both XlYes[:]NoE]N E]Yes❑NoON jFX- lYesDNoE]N EYes E]Noa <br /> product and water)?* <br /> Turbine shutdown response time: 2-5sec 2-5sec 2-5sec 2-5sec <br /> Is system programmed for fail-safe ❑ ❑ � ❑ [:] ❑ [:] � <br /> shutdown?* X Yes N N X Yes N N X Yes N N X❑ [:]No[_Yes No <br /> Was fail-safe verified to be EYes�No�N Yes�No❑N Yes�No❑N Yes[No�I <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starling Smin 5min 5min 5min <br /> test: _ <br /> Test Start Time: 14:2 9 16:06 12 :00 10:50 <br /> Initial Reading(Ri): 0 0 0 0 <br /> Test End Time: 14:59 16:36 12 :3 0 11:20 <br /> Final Reading(RF): - .0001" - .0005" +.0003" - .0018" <br /> Test Duration: 30min 30min 30min 30min <br /> Change in Reading(R p-RI ): - .0001" - .0005" +.0003" -.0018" <br /> Pass/Fail Threshold or Criteria: +- .002" +- . 002" +- .002" +- .002" <br /> Pass ❑ Fail X❑Pass ❑ Fail Ifl Pass - ail LX]Pass D Fail <br /> Was sensor removed for testing? % YesE]No❑NA X Yes N NA R Yes N NA X Yes No <br /> Was sensor properly replaced and Ye�N�NA ❑Ye�NNA❑ <br /> verified functional after testing? ❑Ye N NA ❑X Yes❑ <br /> N <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> motor oil, t-6 waste oil, and soap sumps and secon ry lines were not tested due to bad <br /> boots <br /> t If the entire depth of the sump is not tested,specify how much was tested.If the answer to anv of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />