My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
1126
>
2300 - Underground Storage Tank Program
>
PR0231364
>
COMPLIANCE INFO 2013-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 1:27:20 PM
Creation date
11/8/2018 9:53:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2016
RECORD_ID
PR0231364
PE
2361
FACILITY_ID
FA0003771
FACILITY_NAME
E F KLUDT & SONS INC
STREET_NUMBER
1126
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906022
CURRENT_STATUS
01
SITE_LOCATION
1126 E PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PINE\1126\PR0231364\COMPLIANCE INFO 2013-2016.PDF
QuestysFileName
COMPLIANCE INFO 2013-2016
QuestysRecordDate
9/7/2017 11:31:40 PM
QuestysRecordID
3629872
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • <br /> SWRCB,January 2002 Page of <br /> 6. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer 7 Industry Standard _Profc�NallEpgiTq <br /> ❑Other(Spec) U1 VV YYYY LLUU <br /> Test Method Used: X Pressure ❑Vacuum f:Hydrostatic <br /> ❑Other(Specify) E TAL #-'SALT <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resoluti !-1/1 o-1,5 <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 4" 3" 4" 3" <br /> Length of Piping Run: Approx. 150' Approx.36' Approx.7' 15' <br /> Product Stored: Clear Diesel Dyed Diesel Dyed Diesel-Siphon Kerosene <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sump#2 Piping Sump#3 Piping Sump#4 <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time: 11:30 11:55 11:50 8:40 <br /> Initial Reading(R,): 3 Psi 3 Psi =12:509:40 si <br /> Test End Time: 12:30 12:55 0Final Reading(Rr): 3 Psi 3 Psi siTest Duration: 1 Hour I Hour ourChange in Reading(Rr-R,): 0 Psi 0 Psi siPass/Fail Threshold or No Loss in Psi No Loss in Psi Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass I Pass <br /> Comments—(include information on repairs made prior to testing and recommended follow-up forfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.