Laserfiche WebLink
SWRCB,January 2002 ei of <br /> 7. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Profesq@yl InOTT4 <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure [I Vacuum _ !Hvdrostatic .,!TAI PoEALT <br /> ❑Other(Specify) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-I5 Psi <br /> Piping Run#5 Piping Run#6-11-S Piping Run#7-10-S Piping Run#8-9-S <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: Approx. 15' Approx. 17' Approx.] 7' 17' <br /> Product Stored: 110 Octane race fuel Clear Diesel Clear Diesel Clear Diesel <br /> Method and location of Test boot at STP Test boot at Test boot at Test boot at <br /> piping-run isolation: Piping Sump#5 UDC#11&12 UDC#10&11-S UDC#9&10 <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> ressure and startingtest: <br /> Test Start Time: 8:45 2:10 2:15 2:20 <br /> Initial Reading(Rn): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test End Time: 9:45 3:10 3:15 3:20 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-Rj): 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass I Pass I Pass Pass <br /> Comments—(include information on repairs made prior to lesting and recommended fallow-up forfailed tests) <br />