My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2016
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
1126
>
2300 - Underground Storage Tank Program
>
PR0231364
>
COMPLIANCE INFO 2013-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 1:27:20 PM
Creation date
11/8/2018 9:53:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2016
RECORD_ID
PR0231364
PE
2361
FACILITY_ID
FA0003771
FACILITY_NAME
E F KLUDT & SONS INC
STREET_NUMBER
1126
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906022
CURRENT_STATUS
01
SITE_LOCATION
1126 E PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PINE\1126\PR0231364\COMPLIANCE INFO 2013-2016.PDF
QuestysFileName
COMPLIANCE INFO 2013-2016
QuestysRecordDate
9/7/2017 11:31:40 PM
QuestysRecordID
3629872
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 . Page of <br /> 9. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Specify) NOV 10 2014 <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) ENVIRONMENTAL !-kEAD H <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resoluti ':OQ9r1 i V'Ji E'.dl <br /> Sump#5 Sump# Sump# Sump# <br /> Sump Diameter: 42" <br /> Sump Depth: 27" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 10 %" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 5„ <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' Water Level 13" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes <br /> product and water?. <br /> Turbine shutdown response time Not Alarmed <br /> Is system programmed for fail-safe Yes <br /> shutdown?* <br /> Was fail-safe verified to be Yes <br /> operational?* <br /> Wait time between applying water 5 Minutes <br /> and starting test: <br /> Test Start Time: 9:05 <br /> Initial Reading(Ri): .001 <br /> Test End Time: 9:35 <br /> Final Reading(RF): .001 <br /> Test Duration: 30 Minutes <br /> Change in Reading(RF-Ri): 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes <br /> Test Result: Pass <br /> Was sensor removed for testing? Yes <br /> Was sensor properly replaced and Yes <br /> verified functional after testing? <br /> Comments (include information on repairs made prior to testing and recommended follow-up for jailed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.