Laserfiche WebLink
SWRCB,January 2002 r, r� Page of <br /> S. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Sped) 0 2014 <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostat! <br /> D Other(Spec) <br /> Test Equipment Used:Caldwell Level Change Indicator Equipment Resglution: .T)Q2'r'` '_ — <br /> 1 H <br /> Sump#1 Sump#2 Sump#3 Sump#4 <br /> Sump Diameter: 42" 42" 42" 42" <br /> Sump Depth: 35 %:" 49" 51" 27" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 10" 23„ 21 9 'fix" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 13" 20" 26" 5" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry Dry <br /> Portion of Sump Tested' Water Level 15" Water Level 30" Water Level 29" Water Level 12" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes Yes Yes <br /> product and water?* <br /> Turbine shutdown response time Not Alarmed Not AlarmedTNo <br /> Alarmed Not Alarmed <br /> Is system programmed for fail-safe Yes Yes Yes <br /> shutdown?' <br /> Was fail-safe verified to be No No No <br /> o erational?* <br /> Wait time between applying water 5 Minutes 5 Minutesinutes 5 Minutes <br /> and starting test: <br /> Test Start Time: 1:15 12:25 11:40 9:00 <br /> Initial Reading(Rj): .001 .001 .001 .001 <br /> Test End Time: 1:45 12:55 12:10 9:30 <br /> Final Reading(RF): .001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass Pass <br /> Was sensor removed for testing? Yes Yes Yes Yes <br /> Was sensor properly replaced and Yes Yes Yes Yes <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />