Laserfiche WebLink
{ Confidential <br /> Notice:This ducwnent contains <br /> proprietary and trade secrets <br /> fn korr ation oropw. <br /> p Copy urothcr dissinndalinn in <br /> strictly forbidden. <br /> i <br /> Figure 4-Pressure Test on Drain Valve <br /> 413.Remove the water and test fitting from the spill container. Plug the 1/4"NPT thread in <br /> the nipple. <br /> 5B.Fill the internal space on the test fixture with the Costco additive until the 611STOP <br /> float is completely submerged. Fill the spill container with the Costco additive until <br /> the lower bellows joint is submerged. See Figure 5. <br /> Figure 5 -Test Fixture in Soak <br /> 613.Leave the test fixture soaking and check on weekly to ensure no leaks develop. <br /> 713.After 4 weeks in soak remove all Costco additive from the test fixture. <br /> 813.Repeat step 3B after soak. <br />