Laserfiche WebLink
cnntkienunl <br /> Nolim Thu document contains <br /> pmpriclaryand Imde secrets <br /> information of OP W. <br /> Copy orolher dissimula ion is <br /> strictly forbidden. <br /> 9B.Conduct a hydrostatic test on the spill container. Fill spill container with water and <br /> monitor for any changes in the water level(per instruction sheet H 15225PA). A <br /> water level change of 1/16"or greater after one hour indicates that a leak exists. <br /> 1013. Remove water from test fixture. Disassemble 6l fSTOP from test fixture. <br /> 11B. Inspect 61fSTOP after removal. Conduct standard production test at high and low <br /> flow on valve to ensure proper operation. <br /> . a <br /> e�- <br /> r - <br /> 'ti <br /> r I <br /> Figure 6 - 61ISTOP Flmv Test <br />