Laserfiche WebLink
MONI,4RING SYSTEM CERTIF&TION <br /> For Use By All Jurisdictions Within the State of California Regulations <br /> Authority Cited: Chapter 6.7,Health and Safety Code; Chapter 16, Division 3, Title 23, California Code oforr <br /> ui ment. A separate certification or re ort must be <br /> y eg equi the work. A copy of this form must be provided to <br /> This form must be used to document testing and servicing of monitoring equipment. <br /> of this form to the local agency regulating UST systems <br /> prepared for each monitoring s stem control opel b the technician w o p <br /> the tank system owner/operator. The owner/operator must submit a copy <br /> within 30 days of test date. <br /> A. General information Bldg.No. <br /> Facility Name- Fast Lane-Lathrop (Truck Side) P' <br /> zi 95330 <br /> City: Lathrop, CA <br /> Site Address: 116 E Roth Road Contact Phone No: 707-326-0369 <br /> Facility Contact Person: Hardee p Gill 5/23/2011 <br /> Date of Testing/Servicing: <br /> Make/Model of Monitoring System: VR — 350 <br /> B. Inventory of Equipment Tested/Certified <br /> Check thea ro date bones[o indicates ecific a ui ment ins ected/serviced' Tank ID: ModeL- <br /> TanklD: 1 — Diesel South ❑ In-Tank Gauging Probe. <br /> Model: MA�� p Annular Space or Vault Sensor. Model:_ <br /> Q In-Tack Gauging Probe. P g p Model: <br /> Q Annular Space or Vault Sensor. Model: 30� ❑ Pi in Sum /Trench Sensor(s). <br /> ❑ Fill Sump Sensor(s). <br /> Model, <br /> Q Piping Sump/Trench Sensor(s). Model: 208 G Mechanical Line Leak Detector. Model---- <br /> Model: <br /> oder <br /> Model: 20� Model: <br /> Q Fill Sump Sensor(s). ❑ Electronic Line Leak Detector. <br /> Q Mechanical Line Leak Detector. Model: 99LD G Tank Overfill/High-Level Sensor. Model:------ <br /> u Electronic Line Leak Detector. Model:— <br /> ❑ Tank Overfill/High-Levet Sensor. Model: Othr'(specify equipment type and model in Section E on Page 2). <br /> Q Other(s ecify a ui ment a and model in Section E on Page 2). Tank D''_ Modeh--� <br /> Tank ID- 2 — Dlesel North Mor' — 7 :01 In-1 enk Gauging Probe. <br /> Model <br /> Q In-Tank Gauging Probe. Model'�� G Annular Space or Vault Sensor. Model:— � <br /> Sum <br /> Q Annular Space or Vault Sensor. Model: 30� ❑ Piping p/Trench Sensor(s). <br /> � Fill Sump Sensor(s). Model: <br /> Q Piping Sump/Trench Sensor(s). Model: X08 Mechanical Line Leak Detector. Model:_ <br /> Model: 208 Model: <br /> Q Fill Sump Sensor(s). mai n2DDD ❑ Electronic Line Leak Detector. � <br /> Q Mechanical Linnee Leak Detector. Model: 3 Tank Overfill/High-Level Sensor. Model: <br /> ❑ Electronic Line Leak Detector. Model: <br /> ❑ Tank Overfill/High-Level Sensor. Model:� L] other(specify equipment type and model in Section E on Page <br /> Q Other(specify equi ment t e and model in Section E on Pae 2). Dispenser ID: 16 <br /> Dispenser ID: 13 ❑ Dispenser Containment Sensor(s). Model: 208 <br /> Q Dispenser Containment Sensor(s). Model: 20� 13 Shear Valve(s). <br /> Q Shear Valve(s). ❑ Dispenser Containment Float(s)and Chain(s). <br /> ❑ Dis enser Containment Floats and Chains . Dispenser ID: 17 <br /> Dispenser 1D: 14 �� Q Dispenser Containment Sensor(s). Model: 208 <br /> Q Dispenser Containment Sensor(s). Model: 2 Q Shear Valve(s). <br /> Q ShearValve(s). ❑ Dis Baser Containment Floats and Chains . <br /> ❑ Dis enser Containment Float(s)and Chain s . L;spen:.-r:D: 18 <br /> Dispenser ID: 15 Q Dispenser Containment Sensor(s). Model: 208 <br /> Q Dispenser Containment Sensor(s). Model: 208 Q She.. Valve(s). <br /> Q Shear Valve(s). ❑ Dis enser Containment Floats and Chains . <br /> ❑ Dis enser Containment Float(s and Chain s . <br /> *If the facility contains more tanks or dispensers,copy this form. Include information for every tank and dispenser ator identified in this the facility. <br /> document <br /> ed in accordance <br /> the <br /> C. Certificatio uidI ceAttchedo e <br /> rtif hequipme cation s information (e.g. manuf ctu ers' checklists) necessary to verifyvtha this <br /> manufacturers' <br /> information is correct and a Plot Plan showing the layout of monitoring e4O Scstem set-up equipment© generating such <br /> Alarm history report <br /> reports,I have also attached a copy of the report;(check all that apply) y <br /> Technician Name(print): AI Milburn <br /> Signature: (fZ <br /> Certification No: <br /> A27843 License.No. 956953 <br /> Testing Company Name: EPIC Compliance Systems Inc. <br /> Phone No. 888-700-EPIC <br /> Testing Company Address: 1435 HUntington Ave Suite 230 Date of Testin Servicing: 5/23/2011 <br /> South San Francisco CA 94080 Rev.06/04/01 <br /> Page 1 of 5 <br /> UN-036-1/4 "w.unidocs.org <br />